Well organized company, nice to work with! We just love them! Especial thank you to Artur and Eric, very good work ethic and dependability.
Tualatin ADU Builder
Experience exceptional service with Tualatin ADU Builder by JDI Construction. We expertly design and build ADUs tailored to your city's unique needs and style.
- Family-owned since 2007
- 5-year written warranty
- Licensed in WA & OR
Family-Owned Since 2007
500+ completed projects
See how we transform real homes.
Drag the dividers to compare each project before and after we remodeled it. Every project below was designed, built, and finished by our JDI team.






Portland & Vancouver's trusted design-build team since 2007.
Family-owned, with in-house crews, detailed written proposals, and one accountable team from first conversation to final walkthrough.
Every Tualatin ADU begins with what the lot and the rules permit
An accessory dwelling unit can be a rental, a place for family, or a home office, but the first question is always what the site and the rules permit. JDI Construction is a family-owned design-build remodeler, and we anchor every ADU to that question: it's a second, independent home on your lot, and the zoning and utilities decide what's possible before any design does. The Portland metro is generally very ADU-friendly, which usually helps Tualatin homeowners — but rules still vary by city and jurisdiction, and every lot is different, so we confirm what your specific property allows before drawing anything. Tualatin is newer Southwest suburban, close to the Tualatin River, and the particulars of a given lot — how it drains, where the utilities run, how much room the setbacks leave — shape what a second unit can be.
Our designers and trades work as one team, so the unit you approve is grounded in what the site and the code actually permit — we don't hand a hopeful floor plan to a separate crew and find out later it won't pass. Here's the range of ADUs we build, what decides what's possible, and what to expect on cost and timeline.
The parts that matter most
A good ADU comes down to a handful of things handled in the right sequence. These are the parts we lead with:
Feasibility firstConfirming what your specific lot allows before any design begins.
Site & utilitiesGrading, access, and connecting sewer, water, and power to a new dwelling.
Designing for smallMaking a compact footprint live large with light, storage, and ceiling height.
PermittingNavigating the local ADU rules and inspections, handled for you.
A few decisions worth making early
The choices that shape an ADU land well before design. First is feasibility. The metro's ADU-friendly climate generally helps, but Tualatin's rules are the city's and the county's, not automatically Portland's, and no two lots are alike once drainage, access, and utility locations come into play — so we confirm what your parcel permits before drawing. Second is type and use: a garage conversion, a basement unit, an attached addition, and a detached cottage differ sharply in cost and in what the site has to support, and building for rental income, family, or a home office steers the layout. Third is budgeting for what's out of sight — the sewer, water, and power connections and the system development charges that a new dwelling brings. Given how much newer Tualatin lots can vary in grade and drainage near the river, we scope that site and utility work early so nothing surprises you after design.
What Tualatin homeowners build ADUs for
The ADUs we're asked about in Tualatin generally serve one of a few needs: a rental unit that draws on the region's steady demand for housing, a private space for aging parents or adult children who want to stay close without sharing a roof, or a home office or studio kept separate from the main house. Each moves the design a different direction — a rental favors durability and a separate entrance, a multigenerational unit favors single-level, step-free living.
Tualatin's newer suburban lots tend to lend themselves to a detached cottage or an attached unit, though an existing garage can open up a conversion route as well. Whatever the use, we design a compact footprint to live larger than its square footage, using light, storage, and ceiling height to keep a small home from feeling small.
What does an ADU cost in Tualatin?
ADU cost is driven first by type: a garage or basement conversion that reuses an existing structure generally costs less than a detached cottage built from the ground up. After that come size, finish level, and — the part homeowners most often underestimate — the site and utility work. Extending sewer, water, and power to a new dwelling, managing grading and access, and covering connection fees can take a meaningful share of the budget, which is why we scope it early. With design and trades both in-house, we give you an itemized estimate once we know what your lot allows and which type fits, so the number reflects your project rather than a generic per-square-foot figure.
How long does an ADU take to build?
An ADU runs on three clocks: feasibility and design, permitting, and construction. Permitting for a second dwelling generally takes longer than a remodel because it involves zoning and utility review, so we build that time into the plan rather than promising a quick turnaround. Once permits are issued, construction depends on the type — a conversion is faster than a ground-up cottage. We give you a realistic schedule after the feasibility check, handle the permitting, and keep you updated through our client portal as the unit takes shape.
Why homeowners in Tualatin choose JDI
An ADU rewards a builder who understands the rules as well as the construction, because the project can stall at the permit counter long before the first wall goes up. As a single accountable design-build team, we handle the feasibility, the design, the utility connections, and the build under one roof, so nothing slips between a zoning question and the crew on site. We manage the permitting, keep you informed through our client portal, and stand behind the work with a five-year workmanship warranty. We're based across the river in Vancouver, a short drive away, close enough to stay responsive through a project this involved.
What you can count on
- Family-owned and operating since 2007
- In-house design and in-house trades — one accountable team
- Licensed and insured in Oregon (CCB #176101) and Washington (#JDICOCN932KZ)
- 5-year workmanship warranty on every project
- Permitting and project management handled for you
- Financing through Lend Home Improvement — $0 down, no prepayment penalty
Start with a Tualatin ADU feasibility check
Book a free consultation. We'll look at your lot, talk through what your property allows and which type of ADU fits, and follow up with a clear plan and a 3D design layout. Ask about our current $1,500 offer.
JDI Construction — "Built by family. Trusted by neighbors." Design-build remodeling and ADU construction based in downtown Vancouver, WA, serving Tualatin and the greater Portland–Vancouver metro since 2007.
Serviced ZIP Codes: 97062, 97224
Why JDI
The Right Choice for Your Home
Free, No-Pressure Estimates
Clear, upfront pricing with zero hidden costs.
18+ Years of Experience
Local craftsmanship serving Vancouver and Portland since 2007.
Top-Quality Materials
Designed for beauty, built for lasting durability.
Fully Licensed & Insured
Confidence and protection every step of the way.
Clean, Respectful Crews
We treat your home like it's our own.
Our 3-Step Remodeling Process
From first call to final walkthrough, we handle every detail so you can focus on enjoying your new space.
Get in Touch
Reach out to us online or give us a call to schedule your free consultation. Our team is here to discuss your home remodeling needs and give you all the information you need.
- Personal Consultation
- What to Expect
- Detailed Estimate
Kickoff the Design Phase
Once you sign the design agreement, our design team will meet with you to discuss your priorities, goals, and design style for your home remodel project.
- In-Depth Design Consultation
- Design Development
- Design Finalization & Budget
Start Your Project
We'll kick off with a pre-construction meeting to outline logistics and expectations. Our design team hands over all details to the construction crew, and a dedicated project manager becomes your main point of contact.
- Portal Access for Updates
- Construction Phase Coordination
- Final Walkthrough
Hear it from real homeowners.
What homeowners say about our building projects.
Real reviews from JDI's Vancouver and Portland Google business profiles.
Instant remodeling cost estimates for Vancouver and Portland area homes.
90-second quiz. See your range before sharing your details. No sales call required.
Frequently Asked Questions about ADU Builder in Tualatin
How can I determine if my property in Tualatin is eligible for an ADU build?
We start by reviewing the specific zoning regulations and building codes relevant to Tualatin to determine if your property can accommodate an Accessory Dwelling Unit (ADU). Our team then conducts an initial site evaluation to assess the feasibility of the installation, considering factors such as space, existing structures, and local ordinances that might affect the project.
What types of ADUs does JDI Construction build in Tualatin?
We design and build detached ADUs, attached ADUs, garage conversions and above-garage units. Our design team plans the unit with you and matches its siding, roofline and finishes to the main house, and we handle the permits.
Can you guide me through obtaining the necessary permits for an ADU in Tualatin?
We assist you with the entire permitting process for your ADU project in Tualatin. This includes preparing and submitting all necessary documentation to local authorities, advising on compliance with local building codes, and ensuring that all your paperwork is in order for a hassle-free approval process.
How long will it take to complete an ADU project once all permits are approved?
Once all permits are obtained, the timeline for completing an ADU project typically ranges from a few months up to a year, depending on the complexity and size of the ADU. We provide a detailed project timeline upfront, and our team works efficiently to meet these deadlines while ensuring high-quality craftsmanship throughout the construction process.
What are the common challenges you face during ADU installations and how do you handle them?
We often encounter challenges such as unexpected ground conditions, delays in material supplies, or sudden changes in weather that can affect the project timeline. We handle these challenges by maintaining clear and open communication with you, employing flexible project management strategies, and always having contingency plans in place to mitigate any disruptions.
How does JDI Construction ensure the quality and durability of its ADU installations?
We use only high-quality materials sourced from reputable suppliers and adhere to stringent building standards. Our construction team comprises skilled professionals who follow best practices in building techniques. Additionally, we conduct multiple quality inspections during and after the construction process to ensure that every aspect of your ADU meets our high standards.
What energy-efficient options do you offer for ADU builds in Tualatin?
Much of an ADU's long-term efficiency is decided during construction: good insulation and air sealing, energy-efficient windows and doors, efficient heating and cooling, and LED lighting. We build to the current energy code and can talk through which upgrades beyond it pay off for how you plan to use the unit.
How can I ensure that my ADU build aligns with the aesthetics of my existing home?
We work closely with you to select designs and materials that seamlessly integrate with your existing home’s aesthetics. Our design team will present you with options that match the architectural style and finishing of your main residence, ensuring that both your home and ADU present a cohesive and visually appealing appearance.
More services in Tualatin
ADU building guides
Everything here can be verified.
JDI Construction NW LLC is a licensed and insured design-build remodeler headquartered at 1419 Broadway Street in Vancouver, WA. Look up our licenses, read what past clients wrote, and see the work before you call.
Start Your ADU Project with Tualatin ADU Builder Today!
Discover the benefits of Tualatin ADU Builder and how we can transform your space. Reach out to us now!
- Get in TouchA personal consultation and a detailed estimate.
- Kickoff the Design PhaseDesign development, finalization, and budget.
- Start Your ProjectA dedicated project manager and portal access for updates.
Based in Vancouver. Serving Clark County & the Portland metro.
Headquartered at 1419 Broadway Street, Vancouver, with a Portland meeting office by appointment. No franchises; our in-house crews drive to every project from here.

























