Good work. They started the job before they had all the materials in hand so there was a 2 week delay in finishing the job. The installation was well done & there were no problems. Owner kept in touch about the job (was at a rental) and where they were in the process. I really appreciated that.
Felida ADU Builder
Experience exceptional service with Felida ADU Builder by JDI Construction. We expertly design and build ADUs tailored to your city's unique needs and style.
- Family-owned since 2007
- 5-year written warranty
- Licensed in WA & OR
Family-Owned Since 2007
500+ completed projects
See how we transform real homes.
Drag the dividers to compare each project before and after we remodeled it. Every project below was designed, built, and finished by our JDI team.






Portland & Vancouver's trusted design-build team since 2007.
Family-owned, with in-house crews, detailed written proposals, and one accountable team from first conversation to final walkthrough.
An ADU is its own building, and the site work sets the pace
An ADU is a real building with its own kitchen, bath, and utilities, which is why the site work and connections drive as much of the cost as the walls do. JDI Construction is a family-owned, Vancouver-based design-build remodeler, and we treat an accessory dwelling unit as a second, independent home — so we begin by confirming what your specific Felida property actually allows before we design anything. That's a good fit for this part of the county: Felida is an established, unincorporated neighborhood in northwest Vancouver near Vancouver Lake, with settled homes on larger lots that often have the room a detached unit wants.
Our designers and trades work as one team, so the unit you approve is grounded in what the site and the code actually permit — we don't hand a hopeful floor plan to a separate crew and find out later it won't pass. Here's the range of ADUs we build, what decides what's possible, and what to expect on cost and timeline.
What decides what you can build
A few factors settle what's possible on your lot long before design starts:
Zoning & size limitsWhat your lot's zone allows for a second unit — in size, height, and placement.
Setbacks & coverageHow close to property lines and how much of the lot a unit can occupy.
Parking & accessWhether parking is required and how the unit is reached from the street.
Utilities & feesSewer, water, and power connections, plus the system development charges that come with them.
A few decisions worth making early
The choices that make or break an ADU come well ahead of design. The first is feasibility: ADU rules — size limits, setbacks, height, parking, and fees — are jurisdiction-specific, and because Felida is unincorporated, those rules come from Washington and Clark County rather than a city code, and they differ from Portland's across the river. We confirm what your specific parcel permits before drawing anything. The second is type and use: a garage conversion, a basement unit, an attached addition, and a detached cottage carry very different costs and site demands, and Felida's larger, established lots frequently make a detached unit a natural fit. Whether the unit is a rental, family housing, or a workspace also shapes the layout. The third is budgeting for the parts you can't see — the sewer, water, and power connections and the system development charges that come with adding a dwelling, which can run farther on a larger lot. We work through all of it up front.
What Felida homeowners build ADUs for
The ADUs we're asked about in Felida usually serve one of a few roles: a rental for income, a private space for aging parents or adult children, or a home office or studio kept separate from the main house. Each steers the design its own way — a rental toward durable finishes and its own entrance, a multigenerational unit toward single-level, step-free living, a workspace toward light and quiet.
Because Felida is part of unincorporated Clark County, the governing rules are Washington's and the county's, which differ from Portland's across the river — a reason we confirm what your parcel allows rather than assume. On the established, larger lots common near Vancouver Lake, a detached cottage is often the natural choice. Whatever the use, we design the compact footprint to live larger than its square footage, with the light, storage, and ceiling height that keep a small home from feeling small.
What does an ADU cost in Felida?
ADU cost starts with type: a garage or basement conversion that reuses an existing structure generally costs less than a detached cottage built from the ground up. After that come size and finish level, and then the piece homeowners most often underestimate — the site and utility work, which tends to carry more weight on Felida's larger lots. Running sewer, water, and power to a new dwelling, handling grading and access, and covering connection fees can be a meaningful share of the budget, which is why we scope them early. With design and trades both in-house, we give you an itemized estimate once we know what your lot allows and which type fits, so the number reflects your project rather than a generic per-square-foot figure.
How long does an ADU take to build?
An ADU runs on three clocks: feasibility and design, permitting, and construction. Permitting for a second dwelling can take longer than a remodel because it involves zoning and utility review, so we build that time into the plan rather than promising a quick turnaround. Once permits are in hand, construction depends on the type — a conversion is faster than a ground-up cottage, and a detached build on a larger Felida lot can add site-prep and utility-run time. We give you a realistic schedule after the feasibility check, handle the permitting, and keep you updated through our client portal as the unit comes together.
Why homeowners in Felida choose JDI
An ADU rewards a builder who understands the rules as well as the construction, because the project can stall at the permit counter long before the first wall goes up — and unincorporated county review has its own particulars worth knowing. As a single accountable design-build team, we handle the feasibility, the design, the utility connections, and the build under one roof, so nothing gets lost between a zoning question and the crew on site. We manage the permitting, keep you informed through our client portal, and stand behind the work with a five-year workmanship warranty. Felida is right in northwest Vancouver, minutes from our base, so we stay responsive throughout a project this involved.
What you can count on
- Family-owned and operating since 2007
- In-house design and in-house trades — one accountable team
- Licensed and insured in Oregon (CCB #176101) and Washington (#JDICOCN932KZ)
- 5-year workmanship warranty on every project
- Permitting and project management handled for you
- Financing through Lend Home Improvement — $0 down, no prepayment penalty
Start with a Felida ADU feasibility check
Book a free consultation. We'll look at your lot, talk through what your property allows and which type of ADU fits, and follow up with a clear plan and a 3D design layout. Ask about our current $1,500 offer.
JDI Construction — "Built by family. Trusted by neighbors." Design-build remodeling and ADU construction based in downtown Vancouver, WA, serving Felida, greater Vancouver, and the surrounding Clark County area since 2007.
Serviced ZIP Codes: 98685, 98686
Why JDI
The Right Choice for Your Home
Free, No-Pressure Estimates
Clear, upfront pricing with zero hidden costs.
18+ Years of Experience
Local craftsmanship serving Vancouver and Portland since 2007.
Top-Quality Materials
Designed for beauty, built for lasting durability.
Fully Licensed & Insured
Confidence and protection every step of the way.
Clean, Respectful Crews
We treat your home like it's our own.
Our 3-Step Remodeling Process
From first call to final walkthrough, we handle every detail so you can focus on enjoying your new space.
Get in Touch
Reach out to us online or give us a call to schedule your free consultation. Our team is here to discuss your home remodeling needs and give you all the information you need.
- Personal Consultation
- What to Expect
- Detailed Estimate
Kickoff the Design Phase
Once you sign the design agreement, our design team will meet with you to discuss your priorities, goals, and design style for your home remodel project.
- In-Depth Design Consultation
- Design Development
- Design Finalization & Budget
Start Your Project
We'll kick off with a pre-construction meeting to outline logistics and expectations. Our design team hands over all details to the construction crew, and a dedicated project manager becomes your main point of contact.
- Portal Access for Updates
- Construction Phase Coordination
- Final Walkthrough
Hear it from real homeowners.
What homeowners say about our building projects.
Real reviews from JDI's Vancouver and Portland Google business profiles.
Instant remodeling cost estimates for Vancouver and Portland area homes.
90-second quiz. See your range before sharing your details. No sales call required.
Frequently Asked Questions about ADU Builder in Felida
How can I ensure the ADU builder I choose is fully licensed and insured for work in Felida?
We prioritize your peace of mind by maintaining all necessary licenses and insurance specific to Felida and the broader Washington area. Our team strictly adheres to local building codes and regulations to ensure that every project we undertake is both safe and compliant. We provide full transparency with our credentials, which we are happy to share with you upon request. This commitment to professionalism protects you against any liability and ensures a smooth, secure construction process.
What steps do you take to ensure the safety of the demolition process in my ADU project?
Our team adheres to rigorous safety protocols throughout the demolition phase of your ADU project. We conduct thorough site assessments to identify any potential hazards and implement appropriate safety measures. All our crew members are extensively trained in the latest safety practices and equipped with personal protective equipment. We also ensure that all machinery and equipment are up-to-date and regularly maintained to avoid any unforeseen issues.
How does your company approach eco-friendly recycling and responsible disposal during demolition?
We are committed to sustainable practices by implementing eco-friendly recycling and responsible disposal methods in all our demolition projects. Our team carefully segregates waste materials to maximize the recycling of reusable resources like metal, wood, and concrete. This not only helps in reducing landfill waste but also conserves natural resources. We collaborate with certified recycling centers in Felida to ensure that all materials are processed responsibly.
Can you provide same-day service for urgent demolition needs in my ADU project?
Yes, we offer same-day service availability for urgent demolition requirements in your ADU project, depending on our current schedule and the specific needs of your project. We understand that some phases of construction can be time-sensitive, and our flexible scheduling allows us to accommodate urgent requests. Please contact us as early as possible so we can align our resources to meet your requirements promptly.
What expertise does your team have with local regulations and building codes in Felida?
Our team possesses extensive local expertise and comprehensive knowledge of Felida’s regulations and building codes. This local know-how ensures that all ADU projects we handle meet the specific legal and community standards required in Felida. Staying abreast of local ordinance changes allows us to provide you with the most accurate and effective construction solutions, avoiding potential legal issues and delays.
How do you handle the pricing and estimates for ADU demolition and construction in Felida?
We believe in transparent pricing and offer free, no-obligation estimates for all ADU demolition and construction projects. Our pricing is detailed and straightforward, outlining all costs associated with your project without hidden fees. Once we understand the scope of your project through an initial consultation and site visit, we provide an itemized estimate that reflects the full cost of the required services.
What should I consider when planning the recycling of materials from my ADU demolition?
When planning for the recycling of materials from your ADU demolition, it is crucial to consider the types of materials that can be recycled and the environmental benefits of doing so. Our expert team will help you identify recyclable materials and advise on the best practices for separation and collection. We emphasize minimizing environmental impact and maximizing the reusability of materials, offering you a demolition solution that is both eco-friendly and cost-effective.
How do you ensure the timely completion of an ADU demolition and construction project in Felida?
We ensure the timely completion of your ADU project by implementing efficient project management practices, from the initial demolition to the final construction phase. Our experienced project managers oversee all aspects of the project to ensure milestones are met on schedule. We utilize efficient workflows, skilled crew members, and effective communication to keep your project on track, addressing any challenges swiftly to avoid delays.
More services in Felida
ADU building guides
Everything here can be verified.
JDI Construction NW LLC is a licensed and insured design-build remodeler headquartered at 1419 Broadway Street in Vancouver, WA. Look up our licenses, read what past clients wrote, and see the work before you call.
Start Your ADU Project with Felida ADU Builder Today!
Discover the benefits of Felida ADU Builder and how we can transform your space. Reach out to us now!
- Get in TouchA personal consultation and a detailed estimate.
- Kickoff the Design PhaseDesign development, finalization, and budget.
- Start Your ProjectA dedicated project manager and portal access for updates.
Based in Vancouver. Serving Clark County & the Portland metro.
Headquartered at 1419 Broadway Street, Vancouver, with a Portland meeting office by appointment. No franchises; our in-house crews drive to every project from here.

























