Licensed & Insured Remodeling Experts

Felida ADU Builder

Experience exceptional service with Felida ADU Builder by JDI Construction. We expertly design and build ADUs tailored to your city's unique needs and style.

 Mercedes
Nathan P.
Jo K.
Brian Smith
Patrick M.
4.8/5|391+ Reviews
10+yrs

Experience serving Felida homeowners.

500+

Projects completed with 5-star satisfaction.

Get a FREE assessment & estimate from our experts. No obligation, good for one year.

Felida ADU Builder
Recent project
Camas, WA's project

Modern Gray Kitchen Remodel

Camas, WA

David's project

Complete Home Remodel

David

Portland's #1 Remodeler

500+ completed projects

Google

4.9/5 rating

Yelp

5/5 rating

Facebook

4.8/5 rating

Angi

4.9/5 rating

Houzz

5/5 rating

GuildQuality

4.9/5 rating

An ADU is its own building, and the site work sets the pace

An ADU is a real building with its own kitchen, bath, and utilities, which is why the site work and connections drive as much of the cost as the walls do. JDI Construction is a family-owned, Vancouver-based design-build remodeler, and we treat an accessory dwelling unit as a second, independent home — so we begin by confirming what your specific Felida property actually allows before we design anything. That's a good fit for this part of the county: Felida is an established, unincorporated neighborhood in northwest Vancouver near Vancouver Lake, with settled homes on larger lots that often have the room a detached unit wants.

Our designers and trades work as one team, so the unit you approve is grounded in what the site and the code actually permit — we don't hand a hopeful floor plan to a separate crew and find out later it won't pass. Here's the range of ADUs we build, what decides what's possible, and what to expect on cost and timeline.

What decides what you can build

A few factors settle what's possible on your lot long before design starts:

Zoning & size limitsWhat your lot's zone allows for a second unit — in size, height, and placement.
Setbacks & coverageHow close to property lines and how much of the lot a unit can occupy.
Parking & accessWhether parking is required and how the unit is reached from the street.
Utilities & feesSewer, water, and power connections, plus the system development charges that come with them.

A few decisions worth making early

The choices that make or break an ADU come well ahead of design. The first is feasibility: ADU rules — size limits, setbacks, height, parking, and fees — are jurisdiction-specific, and because Felida is unincorporated, those rules come from Washington and Clark County rather than a city code, and they differ from Portland's across the river. We confirm what your specific parcel permits before drawing anything. The second is type and use: a garage conversion, a basement unit, an attached addition, and a detached cottage carry very different costs and site demands, and Felida's larger, established lots frequently make a detached unit a natural fit. Whether the unit is a rental, family housing, or a workspace also shapes the layout. The third is budgeting for the parts you can't see — the sewer, water, and power connections and the system development charges that come with adding a dwelling, which can run farther on a larger lot. We work through all of it up front.

What Felida homeowners build ADUs for

The ADUs we're asked about in Felida usually serve one of a few roles: a rental for income, a private space for aging parents or adult children, or a home office or studio kept separate from the main house. Each steers the design its own way — a rental toward durable finishes and its own entrance, a multigenerational unit toward single-level, step-free living, a workspace toward light and quiet.

Because Felida is part of unincorporated Clark County, the governing rules are Washington's and the county's, which differ from Portland's across the river — a reason we confirm what your parcel allows rather than assume. On the established, larger lots common near Vancouver Lake, a detached cottage is often the natural choice. Whatever the use, we design the compact footprint to live larger than its square footage, with the light, storage, and ceiling height that keep a small home from feeling small.

What does an ADU cost in Felida?

ADU cost starts with type: a garage or basement conversion that reuses an existing structure generally costs less than a detached cottage built from the ground up. After that come size and finish level, and then the piece homeowners most often underestimate — the site and utility work, which tends to carry more weight on Felida's larger lots. Running sewer, water, and power to a new dwelling, handling grading and access, and covering connection fees can be a meaningful share of the budget, which is why we scope them early. With design and trades both in-house, we give you an itemized estimate once we know what your lot allows and which type fits, so the number reflects your project rather than a generic per-square-foot figure.

How long does an ADU take to build?

An ADU runs on three clocks: feasibility and design, permitting, and construction. Permitting for a second dwelling can take longer than a remodel because it involves zoning and utility review, so we build that time into the plan rather than promising a quick turnaround. Once permits are in hand, construction depends on the type — a conversion is faster than a ground-up cottage, and a detached build on a larger Felida lot can add site-prep and utility-run time. We give you a realistic schedule after the feasibility check, handle the permitting, and keep you updated through our client portal as the unit comes together.

Why homeowners in Felida choose JDI

An ADU rewards a builder who understands the rules as well as the construction, because the project can stall at the permit counter long before the first wall goes up — and unincorporated county review has its own particulars worth knowing. As a single accountable design-build team, we handle the feasibility, the design, the utility connections, and the build under one roof, so nothing gets lost between a zoning question and the crew on site. We manage the permitting, keep you informed through our client portal, and stand behind the work with a five-year workmanship warranty. Felida is right in northwest Vancouver, minutes from our base, so we stay responsive throughout a project this involved.

What you can count on

  • Family-owned and operating since 2007
  • In-house design and in-house trades — one accountable team
  • Licensed in Oregon (CCB #176101) and Washington (#JDICOCN932KZ), bonded & insured
  • 5-year workmanship warranty on every project
  • Permitting and project management handled for you
  • Financing through Lend Home Improvement — $0 down, no prepayment penalty

Start with a Felida ADU feasibility check

Book a free consultation. We'll look at your lot, talk through what your property allows and which type of ADU fits, and follow up with a clear plan and a 3D design layout. Ask about our current $1,500 offer.

JDI Construction — "Built by family. Trusted by neighbors." Design-build remodeling and ADU construction based in downtown Vancouver, WA, serving Felida, greater Vancouver, and the surrounding Clark County area since 2007.

Serviced ZIP Codes: 98685, 98686

Why JDI

The Right Choice for Your Home

  • Free, No-Pressure Estimates

    Clear, upfront pricing with zero hidden costs.

  • 18+ Years of Experience

    Local craftsmanship serving Vancouver and Portland since 2007.

  • Top-Quality Materials

    Designed for beauty, built for lasting durability.

  • Fully Licensed & Insured

    Confidence and protection every step of the way.

  • Clean, Respectful Crews

    We treat your home like it's our own.

Ready to Start Your Project?

Get a free estimate with clear, upfront pricing.

Start My Project
Speak with our team

Frequently Asked Questions about ADU Builder in Felida

How can I ensure the ADU builder I choose is fully licensed and insured for work in Felida?

We prioritize your peace of mind by maintaining all necessary licenses and insurance specific to Felida and the broader Washington area. Our team strictly adheres to local building codes and regulations to ensure that every project we undertake is both safe and compliant. We provide full transparency with our credentials, which we are happy to share with you upon request. This commitment to professionalism protects you against any liability and ensures a smooth, secure construction process.

What steps do you take to ensure the safety of the demolition process in my ADU project?

Our team adheres to rigorous safety protocols throughout the demolition phase of your ADU project. We conduct thorough site assessments to identify any potential hazards and implement appropriate safety measures. All our crew members are extensively trained in the latest safety practices and equipped with personal protective equipment. We also ensure that all machinery and equipment are up-to-date and regularly maintained to avoid any unforeseen issues.

How does your company approach eco-friendly recycling and responsible disposal during demolition?

We are committed to sustainable practices by implementing eco-friendly recycling and responsible disposal methods in all our demolition projects. Our team carefully segregates waste materials to maximize the recycling of reusable resources like metal, wood, and concrete. This not only helps in reducing landfill waste but also conserves natural resources. We collaborate with certified recycling centers in Felida to ensure that all materials are processed responsibly.

Can you provide same-day service for urgent demolition needs in my ADU project?

Yes, we offer same-day service availability for urgent demolition requirements in your ADU project, depending on our current schedule and the specific needs of your project. We understand that some phases of construction can be time-sensitive, and our flexible scheduling allows us to accommodate urgent requests. Please contact us as early as possible so we can align our resources to meet your requirements promptly.

What expertise does your team have with local regulations and building codes in Felida?

Our team possesses extensive local expertise and comprehensive knowledge of Felida’s regulations and building codes. This local know-how ensures that all ADU projects we handle meet the specific legal and community standards required in Felida. Staying abreast of local ordinance changes allows us to provide you with the most accurate and effective construction solutions, avoiding potential legal issues and delays.

How do you handle the pricing and estimates for ADU demolition and construction in Felida?

We believe in transparent pricing and offer free, no-obligation estimates for all ADU demolition and construction projects. Our pricing is detailed and straightforward, outlining all costs associated with your project without hidden fees. Once we understand the scope of your project through an initial consultation and site visit, we provide an itemized estimate that reflects the full cost of the required services.

What should I consider when planning the recycling of materials from my ADU demolition?

When planning for the recycling of materials from your ADU demolition, it is crucial to consider the types of materials that can be recycled and the environmental benefits of doing so. Our expert team will help you identify recyclable materials and advise on the best practices for separation and collection. We emphasize minimizing environmental impact and maximizing the reusability of materials, offering you a demolition solution that is both eco-friendly and cost-effective.

How do you ensure the timely completion of an ADU demolition and construction project in Felida?

We ensure the timely completion of your ADU project by implementing efficient project management practices, from the initial demolition to the final construction phase. Our experienced project managers oversee all aspects of the project to ensure milestones are met on schedule. We utilize efficient workflows, skilled crew members, and effective communication to keep your project on track, addressing any challenges swiftly to avoid delays.

Get Started

Start Your ADU Project with Felida ADU Builder Today!

Discover the benefits of Felida ADU Builder and how we can transform your space. Reach out to us now!