Licensed & Insured Remodeling Experts

Orchards ADU Builder

Experience exceptional service with Orchards ADU Builder by JDI Construction. We expertly design and build ADUs tailored to your city's unique needs and style.

 Mercedes
Nathan P.
Jo K.
Brian Smith
Patrick M.
4.8/5|391+ Reviews
10+yrs

Experience serving Orchards homeowners.

500+

Projects completed with 5-star satisfaction.

Get a FREE assessment & estimate from our experts. No obligation, good for one year.

Orchards ADU Builder
Recent project
Camas, WA's project

Modern Gray Kitchen Remodel

Camas, WA

David's project

Complete Home Remodel

David

Portland's #1 Remodeler

500+ completed projects

Google

4.9/5 rating

Yelp

5/5 rating

Facebook

4.8/5 rating

Angi

4.9/5 rating

Houzz

5/5 rating

GuildQuality

4.9/5 rating

The feasibility check comes before the floor plan

The hardest part of building an ADU usually isn't the construction — it's confirming what your specific lot actually allows. JDI Construction is a family-owned, Vancouver-based design-build remodeler, and we approach every accessory dwelling unit as a second, independent home on your property, which means the zoning and the utilities set the terms before the design does. So we confirm what your Orchards lot permits first, then design to it. Orchards is unincorporated east Vancouver, a blend of mid-century streets and newer subdivisions near SR-500, and the range of lots here means the ADU answer really does change parcel by parcel.

Our designers and trades work as one team, so the unit you approve rests on what the site and the code will genuinely permit — we don't hand a hopeful floor plan to a separate crew and find out later it won't clear review. Here's the range of ADUs we build, what decides what's possible on your lot, and what to expect on cost and timeline.

What decides what you can build

Before a single line is drawn, a handful of factors set the boundaries of what your Orchards lot can hold. These are the ones we confirm first:

Zoning & size limitsWhat your lot's zone allows for a second unit — in size, height, and placement.
Setbacks & coverageHow close to property lines and how much of the lot a unit can occupy.
Parking & accessWhether parking is required and how the unit is reached from the street.
Utilities & feesSewer, water, and power connections, plus the system development charges that come with them.

A few decisions worth making early

The decisions that make or break an ADU land well before design. The first is feasibility. ADU rules — the categories of size, height, placement, parking, and fees — are set by the jurisdiction, and because Orchards is unincorporated, the governing rules are Washington's and Clark County's, not Portland's or Oregon's on the other side of the river. What a lot allows over there tells you nothing about your parcel here, so we confirm your specific site before anything is drawn. The second decision is type and use — a garage conversion, a basement unit, an attached addition, and a detached cottage each carry their own site demands, and whether the unit is meant for rental income, family, or a home office guides the plan. The third is budgeting for the parts you can't see: the sewer, water, and power connections and the system development charges that ride along with a new dwelling. We put all of it on the table up front so nothing catches you off guard after design.

What Orchards homeowners build ADUs for

Most ADUs we're asked about in Orchards fall into a few uses: a rental for reliable income, a private space for aging parents or adult children who want to stay nearby, or a quiet office or studio separate from the main house. Each use nudges the design a different way — a rental favors durability and a private entrance, a multigenerational unit favors single-level, accessible living.

Because Orchards sits in unincorporated Clark County, the applicable rules are Washington's and the county's, which differ from those across the river — another reason we begin by confirming what your parcel allows rather than assuming. Whatever the use, we design a compact footprint to live larger than its square footage, with the light, storage, and ceiling height that keep a small home from feeling cramped.

What does an ADU cost in Orchards?

ADU cost is driven first by type: a garage or basement conversion that reuses an existing structure generally costs less than a detached cottage built from scratch. After that come size, finish level, and — the piece homeowners tend to underestimate — the site and utility work. Running sewer, water, and power to a new dwelling, managing grading and access, and covering connection fees can account for a meaningful share of the budget, which is exactly why we scope it early. With design and trades both in-house, we give you an itemized estimate once we know what your lot allows and which type fits, so the number reflects your project rather than a generic per-square-foot figure.

How long does an ADU take to build?

An ADU runs on three clocks: feasibility and design, permitting, and construction. Permitting for a second dwelling can take longer than a remodel because it involves both zoning and utility review, so we build that time into the plan rather than promising a fast turnaround. Once permits are secured, construction depends on type — a conversion moves quicker than a ground-up cottage. We give you a realistic schedule after the feasibility check, carry the permitting ourselves, and keep you updated through our client portal as the unit comes together.

Why homeowners in Orchards choose JDI

An ADU rewards a builder who understands the rules as well as the construction, because the project can stall at the permit counter long before the first wall goes up. As a single accountable design-build team, we handle the feasibility, the design, the utility connections, and the build under one roof, so nothing gets lost between a zoning question and the crew on site. We manage the permitting, keep you informed through our client portal, and stand behind the work with a five-year workmanship warranty. Being just a short drive west in Vancouver, we're close enough to stay responsive throughout a project this involved.

What you can count on

  • Family-owned and operating since 2007
  • In-house design and in-house trades — one accountable team
  • Licensed in Oregon (CCB #176101) and Washington (#JDICOCN932KZ), bonded & insured
  • 5-year workmanship warranty on every project
  • Permitting and project management handled for you
  • Financing through Lend Home Improvement — $0 down, no prepayment penalty

Start with an Orchards ADU feasibility check

Book a free consultation. We'll look at your lot, talk through what your property allows and which type of ADU fits, and follow up with a clear plan and a 3D design layout. Ask about our current $1,500 offer.

JDI Construction — "Built by family. Trusted by neighbors." Design-build remodeling and ADU construction based in downtown Vancouver, WA, serving Orchards and the greater Portland–Vancouver metro since 2007.

Serviced ZIP Codes: 98662, 98682, 98684, 98664, 98660

Why JDI

The Right Choice for Your Home

  • Free, No-Pressure Estimates

    Clear, upfront pricing with zero hidden costs.

  • 18+ Years of Experience

    Local craftsmanship serving Vancouver and Portland since 2007.

  • Top-Quality Materials

    Designed for beauty, built for lasting durability.

  • Fully Licensed & Insured

    Confidence and protection every step of the way.

  • Clean, Respectful Crews

    We treat your home like it's our own.

Ready to Start Your Project?

Get a free estimate with clear, upfront pricing.

Start My Project
Speak with our team

Frequently Asked Questions about ADU Builder in Orchards

How can I determine if an ADU construction is possible on my orchard property?

We assess the viability of building an Accessory Dwelling Unit (ADU) on your orchard by reviewing local zoning laws and site-specific conditions such as topography, soil stability, and access to utilities. We’ll help you navigate these regulations and provide a detailed site analysis to ensure that your project is feasible.

What preparation steps do I need to take before JDI Construction starts installing an ADU?

Before we commence work, we recommend that you secure the necessary building permits and ensure that the future ADU site is clear of obstructions such as large debris or old structures. Additionally, planning for utility connections is crucial; we will guide you on organizing site surveys and obtaining clearance from utility companies.

What custom exterior options can JDI Construction provide for an ADU on my orchard?

We offer a variety of exterior finishes to complement the aesthetic of your existing orchard environment including various siding materials, roofing options, and window styles. We specialize in custom solutions that blend functionality with orchard aesthetics, such as durable materials that withstand local weather conditions while enhancing the natural surroundings.

How long will the installation of an ADU in my orchard take with JDI Construction?

The timeline for ADU installation varies based on size, design complexity, and permit processes. Once permits are secured, a standard ADU project can take anywhere from a few weeks to several months. We strive to minimize disruption to your orchard operations and will provide a detailed timeline upfront, keeping you informed throughout the process.

Can JDI Construction assist with integrating energy-efficient features into my ADU design?

We prioritize sustainability and efficiency in our builds. We can integrate energy-efficient windows, insulation, solar panels, and other sustainable building materials and technologies into your ADU. We’ll discuss your specific energy goals and provide tailored solutions to ensure that your unit is as energy-efficient as possible.

What kind of maintenance should I expect for an ADU installed in an orchard environment?

ADUs in orchard settings might face unique environmental exposures, such as organic debris and proximity to wildlife. We suggest regular maintenance checks on the exterior materials and utilities. We use durable materials tailored for such environments and can guide you on best practices for maintaining your ADU’s integrity over time.

How will JDI Construction ensure that the ADU complies with local building codes?

We stay updated with all local building regulations and codes to ensure every aspect of your ADU meets or exceeds these standards. We handle all the documentation and inspections required, providing peace of mind that your ADU build in the orchard will be fully compliant and officially approved.

What warranty or post-installation support does JDI Construction offer for ADU builds?

We provide a comprehensive warranty covering labor and materials used in the ADU construction, details of which we’ll specify in our contract. Additionally, we offer post-installation support to address any concerns or issues that may arise after completion, ensuring your satisfaction and the longevity of your ADU.

Get Started

Start Your ADU Project with Orchards ADU Builder Today!

Discover the benefits of Orchards ADU Builder and how we can transform your space. Reach out to us now!