Arthur and JDI construction did a great job for home remodeling. Arthur and JDI understand our needs and wants, so they worked very hard and did the best things for us. JDI and Arthur guaranteed the job for 1 year. Even a small thing need to be repaired, I called them and they came to fix it and the...
Milwaukie ADU Builder
Experience exceptional service with Milwaukie ADU Builder by JDI Construction. We expertly design and build ADUs tailored to your city's unique needs and style.
- Family-owned since 2007
- 5-year written warranty
- Licensed in WA & OR
Family-Owned Since 2007
500+ completed projects
See how we transform real homes.
Drag the dividers to compare each project before and after we remodeled it. Every project below was designed, built, and finished by our JDI team.






Portland & Vancouver's trusted design-build team since 2007.
Family-owned, with in-house crews, detailed written proposals, and one accountable team from first conversation to final walkthrough.
A Milwaukie ADU starts with what the site and the rules permit
An accessory dwelling unit can be a rental, a place for family, or a home office, but the first question is always what the site and the rules permit. JDI Construction is a family-owned, Vancouver-based design-build remodeler, and we believe an ADU should be shaped by the lot it's built on rather than dropped onto it — so we begin by confirming what your specific Milwaukie property allows. In this close-in Southeast community of older bungalow and mid-century homes, many with an existing detached garage, that starting point often decides whether the smart move is a conversion or a new build.
Our designers and trades work as one team, so the unit you approve is grounded in what the site and the code actually permit — we don't hand a hopeful floor plan to a separate crew and find out later it won't pass. Here's what shapes the project, what decides what's possible, and what to expect on cost and timeline.
The parts that matter most
Before any drawing begins, a handful of factors set the boundaries of what an ADU on your lot can be:
Feasibility firstConfirming what your specific lot allows before any design begins.
Site & utilitiesGrading, access, and connecting sewer, water, and power to a new dwelling.
Designing for smallMaking a compact footprint live large with light, storage, and ceiling height.
PermittingNavigating the local ADU rules and inspections, handled for you.
A few decisions worth making early
The choices that make or break an ADU come well before design. The first is feasibility: Oregon has made ADUs broadly possible, but the particulars — size limits, setbacks, height, parking, and fees — are set locally, and what the City of Milwaukie allows is not the same as neighboring Clackamas County or the City of Portland just to the north. We confirm what your specific lot permits before drawing anything, and on Milwaukie's older, close-in lots that also means checking how an existing garage or older utility service factors in. The second decision is type and use: a garage conversion, a basement unit, an attached addition, and a detached cottage carry very different costs and site demands, and whether you're building for rental income, family, or a workspace shapes the layout. The third is budgeting for the parts you can't see — the sewer, water, and power connections and the system development charges that come with adding a dwelling.
What Milwaukie homeowners build ADUs for
Most Milwaukie ADUs we're asked about serve one of a few purposes: a rental for income, a private and independent space for aging parents or adult children, or a studio or home office kept separate from the main house. Each pulls the design a different way — a rental leans toward durability and its own entrance, a multigenerational unit toward single-level, step-free living.
What stands out in Milwaukie is how many lots already have a detached garage, which makes a garage conversion or a detached backyard unit a natural fit on the bungalow and mid-century properties here. Whatever the use, we design a compact footprint to live larger than its square footage, using light, storage, and ceiling height to keep a small home from feeling small.
What does an ADU cost in Milwaukie?
ADU cost is driven first by type: a garage or basement conversion that reuses an existing structure generally costs less than a detached cottage built from the ground up — and on Milwaukie's garage-equipped lots, that reuse can be a real advantage. After that it's size, finish level, and — the part homeowners often underestimate — the site and utility work. Running sewer, water, and power to a new dwelling, tying into older service on an established lot, and covering connection and system development charges can be a meaningful share of the budget, which is why we scope them early. With design and trades both in-house, we give you an itemized estimate once we know what your lot allows and which type fits, so the number reflects your project rather than a generic per-square-foot figure.
How long does an ADU take to build?
An ADU runs on three clocks: feasibility and design, permitting, and construction. Permitting for a second dwelling can take longer than a straightforward remodel because it involves zoning and utility review, so we build that time into the plan rather than promising a quick turnaround. Once permits are in hand, construction depends on the type — converting an existing garage is generally faster than building a cottage from the ground up. We give you a realistic schedule after the feasibility check, handle the permitting, and keep you updated through our client portal as the unit comes together.
Why homeowners in Milwaukie choose JDI
An ADU rewards a builder who understands the rules as well as the construction, because the project can stall at the permit counter long before the first wall goes up. As a single accountable design-build team, we handle the feasibility, the design, the utility connections, and the build under one roof, so nothing gets lost between a zoning question and the crew on site. We manage the permitting, keep you informed through our client portal, and stand behind the work with a five-year workmanship warranty. Milwaukie is a short drive from our Vancouver home base, close enough for us to stay responsive throughout a project this involved.
What you can count on
- Family-owned and operating since 2007
- In-house design and in-house trades — one accountable team
- Licensed and insured in Oregon (CCB #176101) and Washington (#JDICOCN932KZ)
- 5-year workmanship warranty on every project
- Permitting and project management handled for you
- Financing through Lend Home Improvement — $0 down, no prepayment penalty
Start with a Milwaukie ADU feasibility check
Book a free consultation. We'll look at your lot, talk through what your property allows and which type of ADU fits, and follow up with a clear plan and a 3D design layout. Ask about our current $1,500 offer.
JDI Construction — "Built by family. Trusted by neighbors." Design-build remodeling and ADU construction based in downtown Vancouver, WA, serving Milwaukie and the greater Portland–Vancouver metro since 2007.
Serviced ZIP Codes: 97222, 97267, 97269
Why JDI
The Right Choice for Your Home
Free, No-Pressure Estimates
Clear, upfront pricing with zero hidden costs.
18+ Years of Experience
Local craftsmanship serving Vancouver and Portland since 2007.
Top-Quality Materials
Designed for beauty, built for lasting durability.
Fully Licensed & Insured
Confidence and protection every step of the way.
Clean, Respectful Crews
We treat your home like it's our own.
Our 3-Step Remodeling Process
From first call to final walkthrough, we handle every detail so you can focus on enjoying your new space.
Get in Touch
Reach out to us online or give us a call to schedule your free consultation. Our team is here to discuss your home remodeling needs and give you all the information you need.
- Personal Consultation
- What to Expect
- Detailed Estimate
Kickoff the Design Phase
Once you sign the design agreement, our design team will meet with you to discuss your priorities, goals, and design style for your home remodel project.
- In-Depth Design Consultation
- Design Development
- Design Finalization & Budget
Start Your Project
We'll kick off with a pre-construction meeting to outline logistics and expectations. Our design team hands over all details to the construction crew, and a dedicated project manager becomes your main point of contact.
- Portal Access for Updates
- Construction Phase Coordination
- Final Walkthrough
Hear it from real homeowners.
What homeowners say about our building projects.
Real reviews from JDI's Vancouver and Portland Google business profiles.
Instant remodeling cost estimates for Vancouver and Portland area homes.
90-second quiz. See your range before sharing your details. No sales call required.
Frequently Asked Questions about ADU Builder in Milwaukie
How can I determine if my property in Milwaukie is suitable for an ADU build?
We conduct a detailed on-site assessment to determine the suitability of your property for an ADU build. This includes checking local zoning laws, understanding the spatial possibilities of your lot, and assessing existing structures for potential upgrades or modifications required to accommodate an ADU. We also consider factors like access to utilities, which are crucial for the placement and functionality of your ADU.
What types of exterior renovations are necessary for an ADU build on my property?
We handle a range of exterior renovations necessary for ADU builds, including siding, roofing, and foundational work. Depending on your existing structures and the type of ADU you intend to build, renovations might also involve upgrading exterior walls for enhanced insulation, installing new windows and doors for better efficiency and aesthetics, and ensuring that the external finishes match or complement the main residence.
Can you help me navigate the permitting process for building an ADU in Milwaukie?
Yes, we assist you in navigating the permitting process. We have extensive experience working with the local building department in Milwaukie and can help you prepare and submit all necessary documentation. This includes ensuring that your ADU plans comply with all local building codes and regulations. We manage the bureaucracy so you can focus on the exciting aspects of your ADU project.
How long does it typically take to complete an ADU build in Milwaukie?
Typically, an ADU build in Milwaukie takes between 4 to 8 months from start to finish, depending on the complexity and size of the project. We start with a thorough planning and design phase, followed by permitting, which can vary in duration. Once construction begins, we ensure to keep you updated on the progress and any factors that might affect the timeline.
What are some common challenges with ADU builds in Milwaukie and how do you handle them?
Common challenges include navigating zoning regulations, handling site-specific constraints like sloped landscapes, and integrating utilities with the main house. We tackle these challenges by leveraging our local expertise and adaptive project management strategies. We conduct thorough pre-construction assessments to anticipate and mitigate potential issues, ensuring a smooth construction process.
How do you guarantee the quality of materials used in constructing an ADU?
We source high-quality materials from reputable suppliers and perform rigorous checks to ensure they meet or exceed industry standards. We understand that an ADU is a significant investment, so we use durable and well-performing materials that offer longevity and aesthetic appeal, aligning with your specific requirements and local building codes.
What energy-efficient options do you offer for ADU builds?
Much of an ADU's long-term efficiency is decided during construction: good insulation and air sealing, energy-efficient windows and doors, efficient heating and cooling, and LED lighting. We build to the current energy code and can talk through which upgrades beyond it pay off for how you plan to use the unit.
How can I ensure my ADU build in Milwaukie blends aesthetically with my existing home?
We prioritize aesthetic cohesion between your ADU and existing home. This involves selecting complementary exterior materials, matching architectural details, and aligning the overall style. By customizing design elements and finishes, we ensure that your new ADU not only meets functional requirements but also enhances the overall look and value of your property.
More services in Milwaukie
ADU building guides
Everything here can be verified.
JDI Construction NW LLC is a licensed and insured design-build remodeler headquartered at 1419 Broadway Street in Vancouver, WA. Look up our licenses, read what past clients wrote, and see the work before you call.
Start Your ADU Project with Milwaukie ADU Builder Today!
Discover the benefits of Milwaukie ADU Builder and how we can transform your space. Reach out to us now!
- Get in TouchA personal consultation and a detailed estimate.
- Kickoff the Design PhaseDesign development, finalization, and budget.
- Start Your ProjectA dedicated project manager and portal access for updates.
Based in Vancouver. Serving Clark County & the Portland metro.
Headquartered at 1419 Broadway Street, Vancouver, with a Portland meeting office by appointment. No franchises; our in-house crews drive to every project from here.

























