Awesome communication & very fast at what they do with an OUTSTANDING, beautiful result. Big bank for the buck with this quality!! Thank you Arthur + crew!!
Tigard ADU Builder
Experience exceptional service with Tigard ADU Builder by JDI Construction. We expertly design and build ADUs tailored to your city's unique needs and style.
- Family-owned since 2007
- 5-year written warranty
- Licensed in WA & OR
Family-Owned Since 2007
500+ completed projects
See how we transform real homes.
Drag the dividers to compare each project before and after we remodeled it. Every project below was designed, built, and finished by our JDI team.






Portland & Vancouver's trusted design-build team since 2007.
Family-owned, with in-house crews, detailed written proposals, and one accountable team from first conversation to final walkthrough.
An ADU is a full building — and in Tigard the site work sets the terms
An ADU is a real building with its own kitchen, bath, and utilities, which is why the site work and connections drive as much of the cost as the walls do. JDI Construction is a family-owned design-build remodeler, and we treat an accessory dwelling unit as exactly that — a second, independent home on your lot, where the zoning and the utilities decide what's possible before the design does. The Portland metro is generally very ADU-friendly, which usually works in a Tigard homeowner's favor, but rules still vary by city and jurisdiction and every lot differs, so we confirm what your specific property allows before drawing anything. Tigard is established suburban Southwest metro, threaded by Highway 99W, and its settled lots each come with their own setbacks, grades, and utility runs that shape what a second unit can be.
Our designers and trades work as one team, so the unit you approve is grounded in what the site and the code actually permit — we don't hand a hopeful floor plan to a separate crew and find out later it won't pass. Here's the range of ADUs we build, what decides what's possible, and what to expect on cost and timeline.
What decides what you can build
Before a design carries any weight, a few factors set the outer edges of what your lot can support. These are the ones we confirm first:
Zoning & size limitsWhat your lot's zone allows for a second unit — in size, height, and placement.
Setbacks & coverageHow close to property lines and how much of the lot a unit can occupy.
Parking & accessWhether parking is required and how the unit is reached from the street.
Utilities & feesSewer, water, and power connections, plus the system development charges that come with them.
A few decisions worth making early
The decisions that make or break an ADU come well before design. First is feasibility. Tigard benefits from the metro's ADU-friendly climate, but its rules are the city's and the county's, not automatically Portland's, and no two lots behave the same once slope, access, and existing utility lines factor in — so we confirm what your parcel permits before drawing. Second is type and use: a garage conversion, a basement unit, an attached addition, and a detached cottage differ widely in cost and in what the site must support, and building for rental income, family, or a home office shapes the layout. Third is budgeting for what you can't see — the sewer, water, and power connections and the system development charges that a new dwelling brings. Because an ADU is a full building, those connections often carry more of the budget than homeowners expect, so we scope them up front.
What Tigard homeowners build ADUs for
The ADUs we're asked about in Tigard tend to serve one of a few purposes: a rental unit that leans on the region's ongoing housing demand, a private space for aging parents or adult children who want independence close to home, or a home office or studio kept apart from the main house. Each points the design somewhere different — a rental favors durability and its own entrance, a multigenerational unit favors single-level, accessible living.
Tigard's established suburban lots often leave room for a detached cottage or a garage conversion, and near the 99W corridor the mix of older and updated homes opens up interior and attached routes as well. Whatever the use, we design a compact footprint to live larger than its square footage, using light, storage, and ceiling height to keep a small home from feeling small.
What does an ADU cost in Tigard?
ADU cost is driven first by type: a garage or basement conversion that reuses an existing structure generally costs less than a detached cottage built from the ground up. After that come size, finish level, and — since an ADU is a full building — the site and utility work, which homeowners routinely underestimate. Extending sewer, water, and power to a new dwelling, handling grading and access, and paying connection fees can be a substantial share of the budget, which is why we scope it early. With design and trades both in-house, we give you an itemized estimate once we know what your lot allows and which type fits, so the number reflects your project rather than a generic per-square-foot figure.
How long does an ADU take to build?
An ADU runs on three clocks: feasibility and design, permitting, and construction. Permitting for a second dwelling generally takes longer than a remodel because it involves zoning and utility review, so we build that time into the plan rather than promising a fast turnaround. Once permits are in hand, construction depends on the type — a conversion moves faster than a ground-up cottage. We give you a realistic schedule after the feasibility check, handle the permitting, and keep you updated through our client portal as the unit comes together.
Why homeowners in Tigard choose JDI
An ADU rewards a builder who understands the rules as well as the construction, because the project can stall at the permit counter long before framing starts. As a single accountable design-build team, we carry the feasibility, the design, the utility connections, and the build under one roof, so nothing gets lost between a zoning question and the crew on site. We manage the permitting, keep you informed through our client portal, and back the work with a five-year workmanship warranty. Based just across the river in Vancouver, a short drive away, we stay close enough to be responsive through a project this involved.
What you can count on
- Family-owned and operating since 2007
- In-house design and in-house trades — one accountable team
- Licensed and insured in Oregon (CCB #176101) and Washington (#JDICOCN932KZ)
- 5-year workmanship warranty on every project
- Permitting and project management handled for you
- Financing through Lend Home Improvement — $0 down, no prepayment penalty
Start with a Tigard ADU feasibility check
Book a free consultation. We'll look at your lot, talk through what your property allows and which type of ADU fits, and follow up with a clear plan and a 3D design layout. Ask about our current $1,500 offer.
JDI Construction — "Built by family. Trusted by neighbors." Design-build remodeling and ADU construction based in downtown Vancouver, WA, serving Tigard and the greater Portland–Vancouver metro since 2007.
Serviced ZIP Codes: 97223, 97224, 97281, 97291
Why JDI
The Right Choice for Your Home
Free, No-Pressure Estimates
Clear, upfront pricing with zero hidden costs.
18+ Years of Experience
Local craftsmanship serving Vancouver and Portland since 2007.
Top-Quality Materials
Designed for beauty, built for lasting durability.
Fully Licensed & Insured
Confidence and protection every step of the way.
Clean, Respectful Crews
We treat your home like it's our own.
Our 3-Step Remodeling Process
From first call to final walkthrough, we handle every detail so you can focus on enjoying your new space.
Get in Touch
Reach out to us online or give us a call to schedule your free consultation. Our team is here to discuss your home remodeling needs and give you all the information you need.
- Personal Consultation
- What to Expect
- Detailed Estimate
Kickoff the Design Phase
Once you sign the design agreement, our design team will meet with you to discuss your priorities, goals, and design style for your home remodel project.
- In-Depth Design Consultation
- Design Development
- Design Finalization & Budget
Start Your Project
We'll kick off with a pre-construction meeting to outline logistics and expectations. Our design team hands over all details to the construction crew, and a dedicated project manager becomes your main point of contact.
- Portal Access for Updates
- Construction Phase Coordination
- Final Walkthrough
Hear it from real homeowners.
What homeowners say about our building projects.
Real reviews from JDI's Vancouver and Portland Google business profiles.
Instant remodeling cost estimates for Vancouver and Portland area homes.
90-second quiz. See your range before sharing your details. No sales call required.
Frequently Asked Questions about ADU Builder in Tigard
How can I determine if my property in Tigard is suitable for an ADU build?
We conduct a thorough assessment of your property to determine its suitability for an ADU. Our team factors in local zoning laws, the size and condition of your existing lot, and crucial aspects such as accessibility, existing structures, and utility connections. This evaluation ensures that your ADU project complies with all local regulations and is feasible given your property’s characteristics.
What are the specific requirements in Tigard for building an ADU?
We stay up-to-date with the City of Tigard’s building codes and zoning restrictions, including setbacks, maximum size allowances, parking requirements, and height restrictions. During our initial consultation, we’ll outline these regulations and how they pertain to your ADU project, ensuring that the design and planning phases align perfectly with local laws.
How can I maximize the space of my ADU in Tigard while adhering to regulations?
We specialize in designing ADUs that make the most efficient use of space while complying with regulations. Our approach includes innovative layouts, multifunctional spaces, and custom storage solutions. We’ll help you envision a space that achieves your goals for functionality and style, without exceeding the permissible footprint and height restrictions set by Tigard’s regulations.
What materials and construction methods do you recommend for ADU builds in the Tigard area?
We focus on durability and efficiency, recommending materials and construction methods that are suited to the local climate and environmental conditions of Tigard. Our selections typically include energy-efficient windows, insulation that meets or exceeds local codes, and sustainable materials that offer longevity and ecological benefits. Our construction methods aim to minimize waste and maximize energy efficiency.
Can you help me design an ADU that complements my main residence?
Absolutely! We provide customized design services that ensure your new ADU complements the architectural style and finishes of your main residence. From matching exterior finishes and roofing materials to selecting complementary window styles, our designs maintain aesthetic continuity between your ADU and your primary home, boosting both functionality and curb appeal.
How long does it typically take to complete an ADU build in Tigard?
From planning through to completion, an ADU build can typically take anywhere from 6 to 12 months, depending on the complexity and scale of the project. We manage all stages of the timeline, from securing permits to construction and final inspections, ensuring every phase progresses efficiently. We keep you informed at every step, ensuring that there are no unexpected delays.
What kind of budget should I anticipate for an ADU project in Tigard?
The budget for an ADU in Tigard can vary widely based on size, materials, and custom features. We provide detailed quotes that cover all aspects of the build, from initial design and permitting to the final construction details. Our quotes are transparent, including labor, materials, and any contingencies, helping you understand the financial commitment involved without hidden costs.
Are there common pitfalls in ADU construction that I can avoid with proper planning?
Indeed, common pitfalls such as inadequate budgeting, delays in permitting, and underestimating utility needs can be avoided with thorough planning. We emphasize the importance of comprehensive pre-construction assessments, realistic budgeting, and ensuring all design proposals meet local regulations. Our proactive communication and meticulous planning help sidestep these issues, making the construction process as smooth as possible.
More services in Tigard
ADU building guides
Everything here can be verified.
JDI Construction NW LLC is a licensed and insured design-build remodeler headquartered at 1419 Broadway Street in Vancouver, WA. Look up our licenses, read what past clients wrote, and see the work before you call.
Start Your ADU Project with Tigard ADU Builder Today!
Discover the benefits of Tigard ADU Builder and how we can transform your space. Reach out to us now!
- Get in TouchA personal consultation and a detailed estimate.
- Kickoff the Design PhaseDesign development, finalization, and budget.
- Start Your ProjectA dedicated project manager and portal access for updates.
Based in Vancouver. Serving Clark County & the Portland metro.
Headquartered at 1419 Broadway Street, Vancouver, with a Portland meeting office by appointment. No franchises; our in-house crews drive to every project from here.

























