Kitchen Remodel Checklist: From First Idea to Final Walkthrough
By the JDI Construction teamReviewed by Arthur Kulchitskiy, CEOUpdated October 20266 min read
A kitchen remodel runs in nine phases: define the project, set the budget, make the main design decisions, choose a remodeler, sign a written contract, clear permits and pre-construction requirements, prepare the house, build and inspect, then close out with a walkthrough, lien releases and warranty documents. Several steps have deadlines that fall before work starts, so read the whole list first.
This checklist follows a kitchen remodel in the order things actually happen. Each step links to the guide page that explains it, so you can use the list as a map of the whole guide. Read it through once before you start. A few items in the middle have deadlines that fall before construction begins, and they are easy to miss if you meet them only when you get there.
Phase 1: define the project
- Write down why you are remodeling and what does not work now. Start with where to start with a kitchen remodel.
- Decide how much change you want, from a refresh to a full gut, using the remodel levels.
- Note your home's age and what kitchens of that era tend to need: see kitchens by Vancouver home era.
- Sketch the room and consider whether the layout stays. Compare options in kitchen layouts, or small kitchen remodels if space is tight.
- If you plan to stay for the long term, read aging-in-place kitchen design now, while clearances are still easy to change.
Phase 2: set the budget
- Find your range on kitchen remodel cost in Vancouver, WA or with the kitchen cost calculator.
- Learn which categories carry the cost in where the money goes.
- Set a contingency and decide where you will and will not economize: how to budget and where to save.
- Add Washington sales tax, which applies to the full contract price.
- Decide how you will pay: financing options.
- Check what incentives still exist in rebates and tax credits, and whether resale matters to your plan in kitchen remodel ROI.
Phase 3: make the main design decisions
These choices set cabinet sizes, wiring, plumbing and ducting, so they come before pricing can be firm.
- Cabinets: grade, construction and door style. See kitchen cabinets and storage and pantries.
- Range type: gas, electric or induction, and the range hood and ducting that goes with it.
- Sink, faucet and dishwasher positions: sinks, faucets and plumbing.
- Island or peninsula: island size, clearances and power.
- Any wall to be opened: opening a kitchen wall.
- Surfaces: countertops, flooring and backsplashes.
- Lighting plan, decided before drywall: kitchen lighting.
Phase 4: choose who will do the work
- Pick a hiring model: design-build, general contractor or kitchen designer.
- Look up every candidate's registration, bond and insurance: how to verify a contractor in Washington and insurance, bonds and workers' comp.
- Work through the vetting steps in how to choose a kitchen remodeler, and know the red flags.
- Prepare for the site visit: what to expect at a consultation, with the questions to ask in hand.
- Put the proposals on the same footing: how to compare estimates.
Phase 5: contract and paperwork
- Get a written contract that states the scope, price including sales tax, payment schedule and change order process: contracts, deposits and change orders.
- Receive and sign the contractor's disclosure statement ("Notice to Customer"), required by RCW 18.27.114 before work starts on a residential job of $1,000 or more. Keep a copy.
- Read Washington construction liens and agree now that lien releases will be provided before final payment.
- Get the workmanship warranty in writing: kitchen remodel warranties.
- Tell your homeowner's insurer that a remodel is planned and ask whether your coverage needs adjusting.
Phase 6: permits and pre-construction requirements
- Confirm which permits the scope needs: do you need a permit, plus electrical and plumbing, mechanical and gas permits.
- Confirm the jurisdiction for your address and how to apply: the City of Vancouver permit process, or Clark County and nearby cities.
- Settle the asbestos question before demolition. The Southwest Clean Air Agency requires the owner or owner's agent to determine whether suspect asbestos-containing materials are in the work area before any renovation: asbestos rules.
- If the house was built before 1978, confirm the firm is lead-safe certified and that you have received the Renovate Right pamphlet: lead paint rules.
- Apply to the Clark County Assessor for the home improvement exemption before work starts, and in any case before it is completed: property tax and remodeling.
- Get association approval if you have one (condos, townhomes and HOAs) and check listing status for an older property (historic homes).
- Confirm final selections and place orders. Cabinets usually set the start date.
Phase 7: prepare the house
- Set up a temporary kitchen and plan dust control, pets and access: living through a kitchen remodel.
- Review the sequence of work so you know what each week should bring: how long a kitchen remodel takes.
- Decide what will be donated, recycled or hauled: demolition debris, recycling and donation.
- Empty the cabinets, clear the route from the door to the kitchen, and photograph adjoining rooms and floors as they are.
Phase 8: construction and inspections
- Demolition, then framing changes and rough plumbing, electrical, gas and ductwork.
- Rough-in inspections. Work has to stay exposed until it is approved, so walls are not closed first: kitchen remodel inspections.
- Insulation where exterior walls were opened, then drywall, flooring and cabinets.
- Countertop template, fabrication and installation, followed by backsplash, fixtures, appliances and paint.
- Approve every change in writing, with a price, before the changed work is done.
- Pay as phases are completed, as the contract sets out. If you receive a notice of intent to lien from a supplier, tell your contractor and ask for that supplier's lien release. L&I's advice is to make no further payments until it is resolved.
Phase 9: final walkthrough and closeout
- Walk the kitchen with the contractor and write a punch list: doors and drawers, finish flaws, caulk lines, every outlet, every light, every appliance, water at each fixture.
- Confirm final inspections have passed. A kitchen remodel under a building permit also brings the smoke alarm requirement for the whole home into play and, subject to exceptions, an inspection for carbon monoxide alarms.
- Collect the documents in the table below.
- Make the final payment once the punch list is done and the releases are in hand.
- Send the Assessor written notice that the improvement is complete if you applied for the exemption.
- Register appliance and product warranties, and note the care instructions for counters, cabinets and flooring.
| Document | Why you keep it |
|---|---|
| Signed contract and all change orders | The record of what was agreed and what it cost |
| Signed disclosure statement | Shows the contractor's registration number and bond at the time |
| Permit and final inspection approvals | Washington's seller disclosure form asks whether permits and final inspections were obtained for remodeling |
| Lien releases | Evidence that suppliers and other companies on the job were paid |
| Written workmanship warranty | States the term, what is covered and how to make a claim |
| Product warranties, manuals and care guides | Needed for warranty claims and for correct cleaning and maintenance |
| Product list: cabinet line and finish, countertop material, tile, paint colors | For repairs and matching later |
If a problem appears after closeout, start with the contractor and the written warranty. If that fails, see your options if a remodel goes wrong, and if work was done without a permit at any point, unpermitted kitchen work explains how it is put right.
How JDI handles the list
With a design-build remodeler, several of these steps move from your list to the contractor's. JDI Construction handles design, permits and project management for the homeowner, provides an itemized plan and a 3D design layout after a free in-home consultation, posts progress to a client portal, and gives a 5-year written workmanship warranty at closeout. The decisions, the approvals and the final walkthrough remain yours. To start, request a consultation or read about our kitchen remodeling service in Vancouver.
Common questions
Which checklist items have a deadline before construction starts?
Four stand out. The contractor's disclosure statement must be given before work starts on a residential job of $1,000 or more. In a pre-1978 home the lead pamphlet must be given no more than 60 days before renovation begins. The asbestos determination must be made before any renovation activity. And the property tax exemption for improvements should be applied for before work starts, and in any case before it is completed.
Can I skip phases if I am only replacing cabinets and countertops?
You can shorten them, not skip them. A same-layout replacement has fewer design decisions, and Vancouver's code exempts replacing kitchen cabinets from a building permit when no electrical or plumbing system is modified (confirm countertops and flooring with the Permit Center). The budget, contractor checks, written contract, asbestos question and closeout paperwork all still apply.
What should I keep after the remodel is finished?
Keep the signed contract and change orders, the disclosure statement, the permit and final inspection approvals, lien releases, warranty documents, appliance manuals and the list of paint colors and product names. Washington's seller disclosure form asks whether building permits and final inspections were obtained for remodeling, so the permit records matter when you sell.
When should I make the final payment?
After the punch list is complete, final inspections have passed and you have the lien releases you asked for. L&I's advice is to avoid paying for a project in full until all work is completed and you are satisfied with it, and to request a lien release from each contractor and material supplier before final payment.
- Washington L&I: Hire Smart, step by step
- RCW 18.27.114: Disclosure statement (Notice to Customer)
- Washington L&I: Facts About Construction Liens (F625-017-000)
- City of Vancouver: Residential building permits
- Vancouver Municipal Code 17.08.140: Inspections
- Southwest Clean Air Agency: SWCAA 476 asbestos rule
- WAC 365-230-320: Lead renovation information distribution
- Clark County Assessor: Homeowner's Remodel Exemption
Checked October 2026. Rules, fees and programs change; confirm the current requirement with the agency before you rely on it.
Keep going
- JDI ConstructionKitchen remodeling in Vancouver, WAOur kitchen remodeling service, recent projects and what to expect.
- JDI ConstructionRequest a free consultationAn in-home visit, an itemized plan and a 3D design layout.
- JDI ConstructionKitchen cost calculatorA 90-second estimate range for your kitchen, before you share any details.
- Exploring · Hiring and getting startedKitchen Remodeling GlossaryPlain-language definitions of the kitchen remodeling terms found in estimates, plans, contracts and permits, with Washington code figures where they apply.