Kitchen Remodel Checklist: From First Idea to Final Walkthrough

By the JDI Construction teamReviewed by Arthur Kulchitskiy, CEOUpdated October 20266 min read

Quick answer

A kitchen remodel runs in nine phases: define the project, set the budget, make the main design decisions, choose a remodeler, sign a written contract, clear permits and pre-construction requirements, prepare the house, build and inspect, then close out with a walkthrough, lien releases and warranty documents. Several steps have deadlines that fall before work starts, so read the whole list first.

This checklist follows a kitchen remodel in the order things actually happen. Each step links to the guide page that explains it, so you can use the list as a map of the whole guide. Read it through once before you start. A few items in the middle have deadlines that fall before construction begins, and they are easy to miss if you meet them only when you get there.

Phase 1: define the project

Phase 2: set the budget

Phase 3: make the main design decisions

These choices set cabinet sizes, wiring, plumbing and ducting, so they come before pricing can be firm.

Phase 4: choose who will do the work

Phase 5: contract and paperwork

  • Get a written contract that states the scope, price including sales tax, payment schedule and change order process: contracts, deposits and change orders.
  • Receive and sign the contractor's disclosure statement ("Notice to Customer"), required by RCW 18.27.114 before work starts on a residential job of $1,000 or more. Keep a copy.
  • Read Washington construction liens and agree now that lien releases will be provided before final payment.
  • Get the workmanship warranty in writing: kitchen remodel warranties.
  • Tell your homeowner's insurer that a remodel is planned and ask whether your coverage needs adjusting.

Phase 6: permits and pre-construction requirements

Phase 7: prepare the house

Phase 8: construction and inspections

  • Demolition, then framing changes and rough plumbing, electrical, gas and ductwork.
  • Rough-in inspections. Work has to stay exposed until it is approved, so walls are not closed first: kitchen remodel inspections.
  • Insulation where exterior walls were opened, then drywall, flooring and cabinets.
  • Countertop template, fabrication and installation, followed by backsplash, fixtures, appliances and paint.
  • Approve every change in writing, with a price, before the changed work is done.
  • Pay as phases are completed, as the contract sets out. If you receive a notice of intent to lien from a supplier, tell your contractor and ask for that supplier's lien release. L&I's advice is to make no further payments until it is resolved.

Phase 9: final walkthrough and closeout

  • Walk the kitchen with the contractor and write a punch list: doors and drawers, finish flaws, caulk lines, every outlet, every light, every appliance, water at each fixture.
  • Confirm final inspections have passed. A kitchen remodel under a building permit also brings the smoke alarm requirement for the whole home into play and, subject to exceptions, an inspection for carbon monoxide alarms.
  • Collect the documents in the table below.
  • Make the final payment once the punch list is done and the releases are in hand.
  • Send the Assessor written notice that the improvement is complete if you applied for the exemption.
  • Register appliance and product warranties, and note the care instructions for counters, cabinets and flooring.
DocumentWhy you keep it
Signed contract and all change ordersThe record of what was agreed and what it cost
Signed disclosure statementShows the contractor's registration number and bond at the time
Permit and final inspection approvalsWashington's seller disclosure form asks whether permits and final inspections were obtained for remodeling
Lien releasesEvidence that suppliers and other companies on the job were paid
Written workmanship warrantyStates the term, what is covered and how to make a claim
Product warranties, manuals and care guidesNeeded for warranty claims and for correct cleaning and maintenance
Product list: cabinet line and finish, countertop material, tile, paint colorsFor repairs and matching later

If a problem appears after closeout, start with the contractor and the written warranty. If that fails, see your options if a remodel goes wrong, and if work was done without a permit at any point, unpermitted kitchen work explains how it is put right.

How JDI handles the list

With a design-build remodeler, several of these steps move from your list to the contractor's. JDI Construction handles design, permits and project management for the homeowner, provides an itemized plan and a 3D design layout after a free in-home consultation, posts progress to a client portal, and gives a 5-year written workmanship warranty at closeout. The decisions, the approvals and the final walkthrough remain yours. To start, request a consultation or read about our kitchen remodeling service in Vancouver.

Common questions

Which checklist items have a deadline before construction starts?

Four stand out. The contractor's disclosure statement must be given before work starts on a residential job of $1,000 or more. In a pre-1978 home the lead pamphlet must be given no more than 60 days before renovation begins. The asbestos determination must be made before any renovation activity. And the property tax exemption for improvements should be applied for before work starts, and in any case before it is completed.

Can I skip phases if I am only replacing cabinets and countertops?

You can shorten them, not skip them. A same-layout replacement has fewer design decisions, and Vancouver's code exempts replacing kitchen cabinets from a building permit when no electrical or plumbing system is modified (confirm countertops and flooring with the Permit Center). The budget, contractor checks, written contract, asbestos question and closeout paperwork all still apply.

What should I keep after the remodel is finished?

Keep the signed contract and change orders, the disclosure statement, the permit and final inspection approvals, lien releases, warranty documents, appliance manuals and the list of paint colors and product names. Washington's seller disclosure form asks whether building permits and final inspections were obtained for remodeling, so the permit records matter when you sell.

When should I make the final payment?

After the punch list is complete, final inspections have passed and you have the lien releases you asked for. L&I's advice is to avoid paying for a project in full until all work is completed and you are satisfied with it, and to request a lien release from each contractor and material supplier before final payment.