Design-build puts design and construction under one contract, so one company answers for both the drawings and the finished room. A general contractor builds from plans you bring, usually from a separate designer or architect. A kitchen designer plans the room and often supplies cabinets, leaving installation to others. The more your layout changes, the more a single point of responsibility helps.

Every kitchen remodel needs two things done well: someone has to design the room, and someone has to build it. The three common ways to hire differ in whether those jobs sit with one company or two, and that single difference drives most of what homeowners notice later, including when the price becomes firm and who pays when a drawing turns out not to fit the house.

The three models side by side

Design-buildGeneral contractor with separate designerKitchen designer or showroom
Who designsThe building company's own designersAn independent designer or architect you hireThe designer, often tied to a cabinet line
Who buildsThe same companyA general contractor you hire separatelyAn installer the showroom arranges, or a contractor you find
Contracts you signOne (sometimes a design agreement first, then a build contract with the same firm)Two, with two different partiesTwo or more: design and cabinets, then installation and trades
When the price is knownDuring design, because the builder prices as it drawsAfter design is finished and put out for bidsCabinet price early; total price only once all trades are priced
If a drawing does not match the houseOne company resolves itDesigner and contractor must agree whose issue it isDepends on who measured and who installs
Your coordination loadLowestModerate: you sit between two firmsHighest if you hire the trades yourself

Design-build

In design-build, the company that draws your kitchen is the company that builds it. Design and construction happen under one roof and, by the time work starts, under one contract.

What it does well

  • The design is priced as it develops. The people drawing the kitchen know what their own crews and suppliers charge, so a design that drifts past the budget is caught on paper.
  • One party is responsible. If the cabinet plan leaves no room for a duct, or the island lands on a floor joist that cannot take a drain, the firm cannot point at someone else.
  • Handoffs are short. The designer can walk into the room during framing and answer a question that day.

Where to be careful

  • You are not getting competing bids on a finished set of plans, so you need another way to judge the price. Ask for an itemized estimate and compare it against a second firm's number for the same scope.
  • Design quality varies. Ask to see drawings from a past job, not only photos of the result.
  • Find out what happens to the drawings and any design fee if you stop after the design stage.

Design-build suits remodels where the layout changes, walls or plumbing move, or permits and engineering are involved, because those are the jobs where design decisions and construction realities collide most often. Our overview of kitchen remodel levels helps you place your project on that scale.

General contractor with a separate designer

Here you hire an independent kitchen designer, interior designer or architect to produce plans, then take those plans to one or more general contractors for pricing. The contractor builds what is drawn.

What it does well

  • Competitive pricing on a fixed design. Every contractor prices the same drawings, which makes bids far easier to compare.
  • An independent designer. The designer works only for you and has no stake in which contractor wins or which products are used.
  • Freedom to pair specialists. You can choose a designer for their eye and a builder for their craft.

Where to be careful

  • A design can be finished before anyone has priced it. If bids come in over budget, redesign costs time and often a further design fee.
  • When something on the drawings cannot be built as shown, the contractor issues a change order and the designer may or may not agree it was a drawing error. You are the one standing between them.
  • You carry more of the schedule. The contractor cannot order cabinets until the designer's selections are final.

This model suits homeowners who already have a designer they trust, projects led by an architect as part of larger work, and people who want the reassurance of sealed bids. If you go this way, read how to compare kitchen remodel estimates so the bids really are like for like.

Kitchen designer or cabinet showroom

A kitchen designer, whether independent or working at a cabinet showroom, plans the layout and specifies the cabinetry. Many sell the cabinets and countertops too. Installation is then handled by an installer the showroom arranges or by a contractor you hire.

What it does well

  • Deep product knowledge. A designer who works with a cabinet line every day knows its sizes, modifications and storage options in detail.
  • A good fit for replacement jobs. If cabinets and counters are being swapped in the same layout, with no walls, wiring or plumbing moving, there is less to coordinate.

Where to be careful

  • The design is usually built around the lines that showroom sells.
  • Electrical, plumbing, drywall, flooring and permits are outside a cabinet order. Someone has to manage them, and if nobody is named, it is you.
  • Responsibility is split. If cabinets arrive that do not fit, the question is whether the measurements, the design or the installation was wrong.

How to choose between them

Three questions settle it for most people.

  • How much is changing? Same layout, new cabinets and counters: any of the three can work. Sink, range or walls moving: you want the designer and builder tightly linked, either in one firm or with a designer who stays involved through construction.
  • How firm is your budget? If there is a hard ceiling, you want cost feedback during design, not after it.
  • How much coordinating do you want to do? Be honest about the time you have. Acting as the link between a designer, a cabinet supplier and several trades is a part-time job for the length of the project.

Whichever model you pick, the same checks apply to every company involved. Our guide on how to choose a kitchen remodeler gives the order to run them in, and the page on contracts, deposits and change orders explains what each agreement should say about who pays for design errors and changes.

Where JDI fits

JDI Construction is a design-build contractor: design and construction are handled by one team, and we take care of permits and project management for the homeowner. That is the model we think suits kitchens where the layout changes. It is not the only sound choice, and a simple cabinet replacement can be done well through a showroom and a good installer. If you want to see how the stages run with us, our process page lays them out, and our Vancouver kitchen remodeling page describes the service. To see what the first meeting involves under any model, read what to expect at a kitchen remodel consultation.

Common questions

Is design-build more expensive than hiring a designer and a contractor separately?

There is no fixed answer, and we have no reliable figure to quote. With separate contracts you pay a design fee and then a construction price, and you carry the risk that the design costs more to build than expected. With design-build the design work is priced inside one agreement and is drawn against a budget from the start. Compare total cost for the same scope, not the fee structure.

Who owns the drawings if I pay for design and then choose a different builder?

It depends on the agreement, so ask before you sign. Some firms release drawings once the design fee is paid, some keep them, and some release them for an added fee. Get the answer in writing, along with what the drawings will include.

Can I act as my own general contractor and hire the trades myself?

Be careful here. Washington's contractor registration law exempts people working on their own property, but its definition of a contractor also reaches a person who employs more than one trade on a single job. How those two provisions fit together for an owner-occupant is not something our research could confirm, so check with the Department of Labor and Industries before you plan a remodel this way.

Does a cabinet showroom need to be a registered contractor?

If it installs what it sells, yes. RCW 18.27.010 defines a contractor to include cabinet or similar installation, and a consultant acting as a general contractor is also covered. A showroom that only sells cabinets and leaves installation to a company you hire is a different case. Ask who installs, and look that company up in L&I's Verify tool.

Can I bring my own designer to a design-build firm?

Often, yes, but the arrangement changes. If the builder constructs from another person's drawings, it is acting as a general contractor on that job, and questions about a drawing go back to your designer. Ask the firm how it handles outside plans and who answers for errors in them.