Water always finds the weak spot
A shower takes more water in a week than most of a house sees in a year, and it sends that water at every joint, corner and penetration in the enclosure. So the question we ask about a Woodland shower is not which tile, but where the water goes when it gets past the tile, because some always does. JDI Construction is a family-owned design-build remodeler based in Vancouver. We build showers in layers: sound framing, a pan pitched to the drain, a sealed membrane, and only then the surfaces you see.
The people who design your shower and the people who build it are one team. That matters most for the hidden work, where a drawing that says "waterproof" has to become a specific system installed in a specific order. Below is how we think about it, and what Woodland's housing means for the job.
The parts that matter most
None of these show in the finished photos. All of them decide how long the shower lasts:
- 1

Waterproof membraneA sealed layer over the walls and pan, lapped and tied into the drain, so the tile is decoration and not the defense.
- 2

The pan & slopeA floor pitched evenly toward the drain, with no flat spots where water can sit and work into the substrate.
- 3

Drain typeA center point drain or a linear one at the wall. The choice changes the tile layout and how the floor is pitched.
- 4

VentilationA fan that moves enough air and exhausts outdoors, so the enclosure dries out between uses.
A few decisions worth making early
Entry comes first. A standard curb is the simplest to build and keeps water contained with little fuss. A curbless entry looks cleaner and suits anyone planning to stay in the house long term, but the floor framing has to be lowered or the surrounding floor built up so the slope still works, and that has to be designed in from the start.
Then list everything that lives inside the walls. A niche, a bench, a hand shower on a slide bar, a second valve, backing for grab bars: each needs framing or plumbing before the membrane goes on, and none can be added cleanly afterward. Glass belongs on that list too. A frameless panel needs solid backing where its hardware mounts, and its size affects where the shower head should point.
What Woodland showers tend to need
Roughly seven in ten Woodland homes were built after 1990, according to the city's housing analysis, which tells you a lot about the showers. In houses of that age the typical unit is a molded fiberglass or acrylic enclosure, a one-piece tub and shower in the hall bath and a narrow stall in the primary bath. After a few decades the surfaces have dulled, the caulk lines have been redone several times and the door track collects whatever the cleaner misses. Replacing these is usually a clean project. The enclosure comes out in one piece, we can see the framing and subfloor right away, and a tiled walk-in shower fits the same footprint or grows into the space an unused soaking tub was taking.
The older homes in the original townsite call for more caution. Tiled showers built decades ago often relied on methods that have since been superseded, and a shower can look acceptable while moisture is reaching the framing. In those houses we plan for the possibility of repair work behind the wall and price it openly as a contingency. Woodland sits low along the Lewis River in a wet part of the Northwest, so drying is the other half of the job. A new shower paired with the original weak fan is only half finished.
Showers we've built in Clark County
These bath and shower projects were completed south of Woodland, in Battle Ground and Vancouver. Follow any card for the full gallery:
What does a shower remodel cost in Woodland?
Scope sets the price. Swapping one prefabricated unit for another is the modest end. A custom tiled shower costs more because it involves a built pan, a membrane system, tile labor and glass, and each upgrade from there adds to it: a curbless entry, a linear drain, a bench, large-format or patterned tile, a relocated drain or valve. Size matters less than people expect, and complexity matters more. We look at the existing shower in person, design the replacement, and then give you an itemized plan so you can see which features carry the cost.
How long does a shower remodel take?
Shorter than a full bathroom, longer than most people hope. Much of the calendar is waiting for materials to cure: the pan, the membrane, the thinset, the grout and the sealant each need their time before the next step or before the shower gets wet. Frameless glass is measured after the tile is finished and fabricated to that measurement, so it arrives last. We lay out the schedule before demolition, pull the permit when the work calls for one, and tell you plainly how long that bathroom will be out of service.
Why homeowners in Woodland choose JDI
With a shower, the work you cannot inspect is the work that counts, so it helps to have one accountable team responsible for all of it, from framing to glass. We manage the permits and the schedule, keep you current through a client portal, and cover our workmanship with a 5-year warranty. Woodland is at the northern edge of our service area, a drive up I-5 from our Vancouver office, and we sequence a shower so that each trip accomplishes a full stage of the work.
What you can count on
- Family-owned and operating since 2007
- In-house design and in-house trades — one accountable team
- Licensed in Oregon (CCB #176101) and Washington (#JDICOCN932KZ), bonded & insured
- 5-year workmanship warranty on every remodel
- Permitting and project management handled for you
- Financing through Lend Home Improvement — $0 down, no prepayment penalty
Start your Woodland shower remodel
Book a free in-home consultation. We'll look at your space, talk through curbed versus curbless and what to prioritize, and follow up with a clear, itemized plan and a 3D design layout. Ask about our current $1,500 offer.
JDI Construction. "Built by family. Trusted by neighbors." Design-build remodeling based in downtown Vancouver, WA, serving Woodland, neighboring La Center and the wider Portland and Vancouver metro since 2007.