Shower-Only Remodels and Tub-to-Shower Jobs With JDI
By the JDI Construction teamReviewed by Arthur Kulchitskiy, Project Consultant, and Denise Lacquement, Designer (bathrooms and kitchens)Updated October 20265 min read
A shower-only remodel replaces the shower down to the framing (valve, drain, pan, waterproofing, walls and glass) and leaves the rest of the bathroom alone. It makes sense when the vanity, toilet and floor still work. JDI Construction does shower remodels and tub-to-shower conversions; a shower-only remodel or tub-to-shower conversion typically runs $15,000-$20,000, with final pricing set after a free visit.
Not every bathroom needs to be gutted. If the vanity, toilet and floor still work and the shower is the problem, a shower-only remodel fixes the part that is failing for much less disruption than a full remodel. This page covers when that makes sense, what the job actually includes, how permits apply, and how to get one priced by JDI Construction.
Does JDI do shower-only jobs?
Yes. JDI Construction remodels whole bathrooms and also does shower remodels and tub-to-shower conversions. If you came here from one of our shower articles, this is the page for the next step: what a shower-only job with JDI involves and how to ask for one. Our shower remodeling in Vancouver page shows the service itself.
When a shower-only job makes sense
The test is whether the rest of the room is worth keeping. A shower-only job is money well spent when:
- the vanity, counter and toilet are in good shape and you like them;
- the floor is sound, with no soft spots near the tub or toilet;
- the fan works and is ducted outdoors;
- the problem is the shower itself: failing grout or caulk, a cracked base, a dated surround, a leaking valve, or a tub nobody uses.
It is the wrong choice when the floor is soft, when water has damaged the subfloor beyond the shower, or when you already know the whole room will be redone in a few years, since a new shower is built around the layout it sits in. If you are unsure, bathroom remodel levels helps you place your project.
What a shower-only remodel includes
A proper shower remodel goes back to the framing in the shower area. In order, the job usually runs like this:
- Demolition. The old tile or surround, base or pan and the backer behind them come out. In homes built before 1978, painted surfaces fall under Washington's lead-safe renovation rules, and old wall texture or flooring may need an asbestos determination first under the Southwest Clean Air Agency's rule.
- Repairs. Rot at the sill or studs is repaired. Unexpected structural repair is handled by written change order.
- Plumbing. A new valve, a drain in the right place for the new floor, and the showerhead and any handheld supply. JDI uses separate licensed plumbing contractors for all plumbing work, and all electrical work is done by licensed electrical contractors. Under Washington law, plumbing for someone else must be done by a certified plumber; you can check a plumber's certification on L&I's Verify tool.
- Floor. A preformed base or a tiled floor sloped to the drain over a pan or bonded membrane. A curbless floor needs the subfloor lowered or built up to the shower.
- Walls and waterproofing. Backer board and a waterproofing membrane, or a panel system, across the whole wet area. Tile and grout are finishes, not the waterproof layer.
- Finish. Tile or panels, a niche or bench if planned, trim, the showerhead and glass.
| Item | What to settle before ordering |
|---|---|
| Valve | Pressure-balancing or thermostatic. Valves certified to ASSE 1016 have a limit stop that the installer sets. |
| Showerhead | Washington's plumbing code caps showerheads at 1.8 gallons per minute at 80 psi, and multiple outlets on one valve share that cap unless only one runs at a time. |
| Entry | Curb, low curb or curbless. See curbless showers. |
| Walls | Tile over backer and membrane, or a panel system. Either way, the waterproofing method should be named in the quote. |
| Glass | Shower doors and enclosures must be safety glazing meeting the federal CPSC standard; see safety glass and shower doors. |
Converting a tub to a shower
A tub-to-shower conversion is the most common shower-only job. The tub comes out, the drain usually moves to suit the new floor, the valve is raised to shower height, and the wall area to be waterproofed gets taller and wider. Before you remove the last tub in the house, read tub-to-shower conversions, which covers what changes and what to weigh.
Permits for a shower-only job
The rules depend on where you live, as of October 2026:
- City of Vancouver. Vancouver Municipal Code 17.08.090 exempts removing and reinstalling a tub or shower only if the work does not involve replacing or rearranging valves, pipes or fixtures. A new valve, drain or base is not on that list, and the city's 2026 fee table lists "Tub/shower/shower pan" at $15.14 per item on a plumbing permit.
- Unincorporated Clark County. The county says "A plumbing permit is required for installation of any plumbing fixtures."
- Other cities. Rules differ by city; check with your city's building department.
JDI handles permits for its clients. Our page on whether a bathroom remodel needs a permit covers the details.
What it costs
A shower-only remodel or tub-to-shower conversion at JDI typically runs $15,000-$20,000. Final pricing depends on the materials you choose and what we find behind the walls. These are planning ranges, not quotes. If the shower is part of a larger remodel, JDI's cost calculator treats a walk-in or curbless shower as a $4,000-$10,000 add-on to the bathroom remodel ranges. Your own figure comes from a site visit, because the size of the shower, the condition of the framing, whether the drain moves and the tile you choose decide the figure. For the full picture, see shower remodel cost.
JDI also runs a walk-in shower offer. Offers change, so check that page for the current amount, terms and expiry.
How to request a shower-only quote
Schedule a free in-home consultation or call (360) 309-9571, and say it is a shower-only job or a tub-to-shower conversion so the visit covers the right things. We measure the shower, look at the valve wall, the floor and the fan, and talk through base, walls, glass and valve. After the visit JDI sends a firm written quote, typically within a week. If the visit shows the bathroom needs more than a new shower, we will say so and explain why. The work carries JDI's 5-year written workmanship warranty.
Common questions
Does a shower-only remodel need a permit in Vancouver?
Usually, once the valve, drain or pan is replaced. Vancouver Municipal Code 17.08.090 exempts only removing and reinstalling fixtures without replacing or rearranging valves, pipes or fixtures, and the city's 2026 fee table charges per tub, shower or shower pan. Unincorporated Clark County requires a plumbing permit for installing any plumbing fixture.
Can the floor stay if only the shower is replaced?
Often, but not always. Removing a tub or shower base can damage the flooring next to it, and a curbless shower usually means taking up the bathroom floor. Ask at the consultation whether the existing floor can stay.
Is a new valve really necessary?
Replacing the valve while the wall is open is usually the sensible choice, since it is the part hardest to reach later. Shower valves certified to ASSE 1016 limit temperature swings, and ASSE warns that low-flow showerheads should not be used with non-compensating valves.
How long does a shower-only remodel take at JDI?
Usually about 1 week on-site, after design and permits. Glass is measured once the tile is finished, so it can follow a little later. You get a written schedule for your shower after the consultation, once the scope and selections are set.
What is the current shower offer?
JDI runs a walk-in shower offer whose amount and terms change from time to time. The current details are on the offer page, linked on this page.
- Vancouver Municipal Code 17.08.090: permits required and exempt work
- City of Vancouver: Electrical, mechanical and plumbing permit fees 2026
- Clark County: Residential permits
- WAC 51-56-0400: Washington plumbing code amendments (showerhead flow)
- ASSE: Automatic compensating valves
- Washington L&I: Verify a contractor, tradesperson or business
Checked October 2026. Rules, fees and programs change; confirm the current requirement with the agency before you rely on it.
What bathroom clients say
Friendly staff and good service! Very efficient and reliable. This company is really top-notch when it comes to remodeling services. We just had our bathroom renovated and I thought they did just great. Two thumbs up for JDI.
Carole B. · Google review, Dec 5, 2025
Had JDI come out for a bathroom remodel in my home in Tualatin. They were on time, gave a great design, and got the work done within the given time frame. They were competitively priced and did amazing work. I highly recommend them and will be using them for my addition this summer!
Nathan P. · Google review, Jan 10, 2026
This was my second bathroom remodel. They provided me the same quality and expertise as my first. I wanted a more rustic feel bathroom and believe it was achieved. :) The tile work was perfect.
Marilynn Y. · Google review, Jun 26, 2026
Keep going
- JDI ConstructionShower remodeling in Vancouver, WAWalk-in, curbless and tub-to-shower conversions by our design-build team.
- JDI ConstructionWalk-in shower and tub offerThe current special on shower and tub remodels.
- JDI ConstructionRequest a free consultationAn in-home visit, an itemized plan and a 3D design layout.
- Exploring · Hiring and getting startedBathroom Remodeling Glossary: Terms You Will HearPlain-language definitions of the bathroom remodeling terms in estimates, plans and permits, from backer board and blocking to linear drain, sone and thinset.















