Under the Washington Residential Code, glass in walls or enclosures at tubs and showers is a hazardous location when its bottom edge is less than 60 inches above a standing or walking surface, so it must be safety glazing. Shower and tub doors and enclosures must pass the federal CPSC 16 CFR 1201 test, and each pane needs a permanent mark visible after installation.
Glass near a tub or shower is one of the places the building code treats as a hazardous location, because people slip in bathrooms and fall against what is in front of them. Ordinary annealed glass breaks into long, sharp shards; safety glazing either breaks into small pieces or holds together. This page explains where Washington requires safety glazing in a bathroom, how to tell whether glass qualifies, and what an inspector looks for, as of October 2026.
Which code applies
Washington has no amendment to the safety glazing section of the International Residential Code; WAC 51-51-0308 is "Reserved". So the model 2021 IRC section R308 applies as written. In Vancouver it is enforced through the city's building permit and inspections. The 2024 codes are scheduled to take effect on 3 May 2027; until then the 2021 text applies.
The tub and shower rule (R308.4.5)
The core rule reads: "Glazing in walls, enclosures or fences containing or adjacent to hot tubs, spas, whirlpools, saunas, steam rooms, bathtubs, showers and indoor or outdoor swimming pools where the bottom exposed edge of the glazing is less than 60 inches (1524 mm) measured vertically above any standing or walking surface shall be considered to be a hazardous location. This shall apply to single glazing and each pane in multiple glazing."
The exception: glazing more than 60 inches, measured horizontally, from the water's edge of a bathtub, hot tub, spa or whirlpool, or from the edge of a shower, sauna or steam room.
So the test has two parts. Is the glass in a wall or enclosure containing or next to the tub or shower? If yes, is its bottom edge under 60 inches above a standing or walking surface, and within 60 inches horizontally of the water's edge? If both, it must be safety glazing.
Other bathroom glass
| Glass | Hazardous location? | Code basis |
|---|---|---|
| Shower door or tub door | Yes | R308.4.5; doors also under R308.4.1 |
| Fixed shower panel or splash panel at a tub | Yes, if the bottom edge is under 60 in. above a standing surface and within 60 in. of the water's edge | R308.4.5 |
| Window in a tub or shower wall | Usually; confirm the measurement with the inspector | R308.4.5 |
| Window elsewhere in the bathroom | Only if all four apply: pane over 9 sq ft; bottom edge under 18 in. above the floor; top edge over 36 in. above the floor; walking surface within 36 in. horizontally | R308.4.3 |
| Glass in the bathroom entry door | Yes (with exceptions for openings a 3 in. sphere cannot pass and decorative glazing) | R308.4.1 |
| Wall mirror on a continuous backing | No impact test required | R308.3, Exception 2 |
| Mirror or glass panel in a hazardous location without continuous backing (a mirrored door, for example) | Must pass the impact test | R308.3 |
What qualifies: the test standard
Safety glazing in Washington must pass impact testing. For most hazardous locations the code allows either the federal standard, CPSC 16 CFR 1201, or ANSI Z97.1. Bathrooms are an exception: glazing in doors and enclosures for hot tubs, whirlpools, saunas, steam rooms, bathtubs and showers must be tested to CPSC 16 CFR 1201, and Table R308.3.1(1) requires Category II for doors and enclosures covered by R308.4.5 (R308.3.1). The federal standard itself lists "Bathtub doors and enclosures" and "Shower doors and enclosures" among the products it covers.
Tempered glass is the common choice for shower doors and panels. The CPSC definition explains why it is ordered to size: tempered glass "cannot be cut, drilled, ground, or polished after treatment without fracture. When fractured at any point, if highly tempered, the entire piece breaks into small particles."
The mark the inspector looks for
Under R308.1, each pane in a hazardous location needs a manufacturer's designation that names who applied it, the type of glass and the safety glazing standard it meets. The mark must be "visible in the final installation" and "acid etched, sandblasted, ceramic-fired, laser etched, embossed, or be of a type that once applied cannot be removed without being destroyed." A label is permitted in lieu of the designation in some cases. The exceptions are narrow: non-tempered glass with a certificate or affidavit the building official approves, and tempered spandrel glass.
In practice, that small etched bug in the corner of the shower door is the inspector's proof. Do not let anyone grind it off or hide it behind a hinge or clip. Glass without a visible mark may have to be replaced to pass final.
Replacing glass in an existing bathroom
Washington's existing building rules say replacement glazing in hazardous locations must comply with R308 (R4502.5.2). An old shower door made of plain or wired glass cannot be replaced like for like; the new glass must be safety glazing with the required mark.
Shower door rules from the plumbing code
The plumbing code adds two dimensional rules that shape the glass design. "Thresholds shall be of sufficient width to accommodate a minimum 22 inch (559 mm) door. Shower doors shall open so as to maintain not less than a 22 inch (559 mm) unobstructed opening for egress." (UPC 408.5). The Washington plumbing code also sets the minimum shower size (900 square inches with a 30 inch circle). We found no Washington rule requiring hinged shower doors to swing outward; that rule is in the IRC plumbing chapter, which Washington does not use. Door swing is still a practical design question. See bathroom plumbing code.
When the glass goes in
Shower glass is measured after tile is finished, because tempered glass cannot be trimmed on site. That puts glass near the end of the schedule. Ask when the final building inspection will happen relative to glass installation, so the inspector can see the mark. The full sequence is on bathroom remodel inspections.
Who confirms
In Vancouver, the City of Vancouver building inspector checks safety glazing at final (Permit Center, 360-487-7833). In unincorporated Clark County, Clark County Community Development (564.397.4078). JDI Construction includes glass in the bathroom design and orders it once tile is set. See our Vancouver shower remodeling page.
Common questions
Is a frameless shower panel without a door still regulated?
Yes. The rule covers glazing in walls and enclosures containing or adjacent to showers and bathtubs, not only doors. A fixed panel next to a shower with its bottom edge under 60 inches above the floor is in a hazardous location and must be safety glazing.
Can a glass shop cut down an old tempered shower door to fit?
No. The federal standard describes tempered glass as glass that cannot be cut, drilled, ground or polished after treatment without fracture. Tempered panels are cut and drilled before tempering, which is why shower glass is ordered to exact measurements after the tile is finished.
Does the window above my tub need tempered glass?
Often. Glazing in a wall containing or next to a tub or shower is a hazardous location when its bottom edge is under 60 inches above a standing or walking surface, unless it is more than 60 inches horizontally from the water's edge. Ask the inspector how they measure a window inside a tub enclosure before you order it.
Does replacing just the shower glass need a permit?
The Vancouver code's exemption for replacing windows and doors in existing openings is about window and door assemblies, not shower enclosures, and shower glass is not named in the exemption list. Ask the City of Vancouver Permit Center. Either way, the replacement glass must meet the safety glazing rules.
- Washington Residential Code 2021, chapter 3 (R308), via UpCodes
- WAC 51-51-0308: Washington amendments to IRC R308 (reserved)
- WAC 51-51-4502: Replacement glazing (R4502)
- 16 CFR 1201: Safety Standard for Architectural Glazing Materials
- WAC 51-56-0400: Washington UPC shower rules
- IAPMO: 2021 Uniform Plumbing Code
Checked October 2026. Rules, fees and programs change; confirm the current requirement with the agency before you rely on it.
Keep going
- JDI ConstructionShower remodeling in Vancouver, WAWalk-in, curbless and tub-to-shower conversions by our design-build team.
- Planning · Permits and building codesBathroom Remodel Inspections: What Gets Checked and WhenBathroom remodel inspections in Vancouver, WA: the order, city inspection codes, the shower pan flood test, how to schedule, and 2026 reinspection fees.
- Planning · Permits and building codesUnpermitted Bathroom Work: Risks When Buying, Selling or RemodelingWhat to do about a bathroom remodeled without permits in Vancouver, WA: seller disclosure, legalizing through a field evaluation, fees and insurance.
- Planning · Permits and building codesRemodeling a Bathroom in a Condo or TownhomeRemodeling a condo or townhome bathroom in Vancouver, WA: association approval, which city permit applies, shared walls and stacks, shutoffs and noise.