How to Compare Whole-House Remodel and Addition Estimates Line by Line

By the JDI Construction teamUpdated November 20264 min read

Quick answer

Put the estimates side by side on the same scope. Check that each one itemizes design and drawings, permits, demolition, every room and system, allowances for finishes, sales tax and permit fees, and says what is excluded and how hidden damage is handled. The lowest total often leaves something out, so compare what is included before you compare the price.

On a whole-house remodel or an addition, two estimates that are far apart are rarely pricing the same project. One includes the drawings, the permits and a new furnace; the other leaves them for later. The only fair comparison is line by line, on the same scope. This page shows what each line should say and which gaps to look for.

Start by making the scopes match

Before you look at totals, write one short scope list and give it to every contractor: the rooms that change, walls that move, systems you want replaced, any addition, and the finish level you have in mind. Then check each estimate against that list. If a contractor recommends something different, that is useful, but ask them to price your scope too so you can compare.

L&I's advice for hiring a contractor is to compare all parts of each bid, not just the price. On a big project that means reading every line.

What a whole-house estimate should include

As a reference, here is what JDI's own whole-home cost calculator says its planning ranges include. Whoever you hire, their estimate should tell you clearly whether each of these is in or out.

LineWhat to look for
Design and drawingsWho produces the plans the permit is based on, and whether design is part of the price or a separate agreement.
Permits and inspectionsWho applies, who meets the inspectors, and whether the city's permit fees are inside the price or listed separately.
Demolition, haul-away, site protectionDust walls, floor protection, dumpsters and disposal. Easy to leave out of a low bid.
Cabinetry, counters, tile, flooringNamed products or an allowance for each, room by room.
HVACRough-ins only, or a new system. JDI's calculator lists a new HVAC system as a separate add-on.
Plumbing and electricalWho does it and what is included: new circuits, a panel, moved fixtures. In our case, separate licensed plumbing contractors and licensed electrical contractors.
Lighting, fixtures, finished installationWhether fixtures are supplied or only installed.
Sales tax and permit feesShown as their own lines, so you can see the total you will actually pay.

The calculator also says what its ranges leave out: add-ons you did not select (for example a new HVAC system or an addition), repairs to hidden damage found inside walls or floors, which are handled by written change order, and furniture, decor and window coverings. A good estimate from anyone states its exclusions just as plainly.

Allowances: where low bids hide

An allowance is a placeholder budget for something not chosen yet, like tile, plumbing fixtures or lighting. When your final pick costs more, the difference is added to the price. Two estimates can carry very different allowances for the same item, and the one with lower allowances looks cheaper until you start choosing.

  • Ask for every allowance in dollars, item by item.
  • Ask what the allowance buys: a showroom visit or a sample list makes it real.
  • Raise low allowances to a realistic level on every estimate before comparing totals.

Sales tax and permit fees

In Washington, remodeling for a homeowner is a retail sale, and the contractor collects sales tax on the full contract price, labor included (WAC 458-20-170). On a whole-house budget that is a large line of its own. L&I recommends that the contract state the price including sales tax, so make sure every estimate shows it the same way. Our sales tax on remodeling page explains the rates and how to look one up by address.

Permit fees vary by project and jurisdiction. In Vancouver, an addition or remodel needs a residential building permit, and an addition submittal includes a site plan, structural drawings and energy code forms. Ask whether the city's fees are inside the price or listed for you to pay.

Exclusions, hidden damage and change orders

Every older house holds surprises: rot under a bathroom, old wiring, an undersized beam. No estimate can price what nobody has seen, so the question is how it will be handled. Look for:

  • A clear list of exclusions.
  • A written change-order process: the change is described and priced, and you approve it before the work is done.
  • How testing for lead paint or asbestos in an older home is handled, and by whom.

Our contracts, deposits and change orders page covers what Washington homeowners should see in writing.

Schedule, team and warranty

Compare the parts that are not dollars too:

  • Schedule. A realistic on-site time after design and permits. JDI's calculator gives 4 to 7 months for a standard whole-home refresh and 7 to 14 months for mid-sized and large homes or projects with an addition.
  • Who runs the job. A named project manager and how you will get updates.
  • Registration. The contractor's Washington registration number (and Oregon CCB number for Portland-side work) on the estimate.
  • Warranty. Length and coverage in writing. JDI's is a 5-year written workmanship warranty.

The lowest bid can leave things out

When one estimate is well below the others, it is worth one more conversation before you decide. Ask the contractor to go through what is not included and which allowances are low. Sometimes the low bid really is efficient. Often the gap is design, permits, site protection, HVAC or finish allowances, and those costs come back as change orders once work has started.

Next step

An estimate is only as good as the visit behind it. See what to bring to your first consultation and what happens there, so the estimate you get back is built on your real house.

Common questions

Why are two whole-house estimates for the same house so different?

Usually because they are not pricing the same job. One may include design, permits or a new HVAC system and the other may leave them out or carry low allowances for cabinets and tile. Line the scopes up first; the price gap often shrinks or flips.

Should sales tax be included in a remodeling estimate?

It should be shown. In Washington the contractor collects sales tax on the full contract price, labor included, and L&I recommends that the contract state the price including sales tax. If one estimate shows tax and another does not, add it to the second before you compare.

What is an allowance in a remodeling estimate?

An allowance is a budget placeholder for something you have not chosen yet, such as tile or light fixtures. If your final choice costs more, you pay the difference. Low allowances make an estimate look cheaper than the house you actually want.

Is the cheapest estimate a bad sign?

Not always, but check it hardest. A low price can be honest efficiency, or it can be a thin scope, low allowances or items left for change orders later. Ask the contractor to walk you through what is not included.

Sources

What whole-home remodel clients say

  • JDI did a great job remodeling our rental house that needed a lot of work. They put in new floors, completely redid the kitchen and bathrooms. They also painted the entire interior. We had great communication and everything turned out fantastic.

    Todd W. · Google review, Mar 15, 2026

  • JDI Contruction exceeded expectations in every area. From electric, plumbing, tile, glass. It?s night and day the transformation. Everyone who helped on this total remodel was respectful and caring. I will definitely be calling them again for future work. Thank you gentlemen!

    Marilynn Y. · Google review, Jun 17, 2026

  • This is our second time working with JDI... they do exceptional work and even more they stand begind the work they do which is getting rare these days. Looking forward to doing a Kitchen Remodel with them next, thanks again!

    Anthony G. · Google review, May 13, 2026

Read more whole-home remodel reviews →

Keep going