How Much Does a Whole-House Remodel Cost in Vancouver, WA?

Living room with a fireplace in a Vancouver, WA whole-home remodel by JDI

A whole-house remodel in the Vancouver and Portland area typically costs $85,000–$140,000 at the low end, for an Essential-level refresh of a 1,500–2,500 sq ft home, and $625,000–$1.1 million at the top, for a Luxury-level remodel of a home over 3,500 sq ft. Those are JDI's 2026 design-build calculator ranges, covering labor, permits and materials. Where your project lands depends on the size of the house, the finish level, how much of the layout changes, and add-ons such as an addition or new HVAC.

Whole-house remodel cost ranges by home size and finish level

These are the ranges from JDI's whole-home cost calculator, based on 2026 Portland and Vancouver pricing for design-build projects.

Home size and typical scopeEssentialSignatureLuxury
Standard refresh: 1,500–2,500 sq ft, kitchen, 1–2 baths and living areas$85k–$140k$140k–$240k$240k–$420k
Mid-sized home: 2,500–3,500 sq ft, kitchen, 2–3 baths and living areas$135k–$215k$215k–$365k$365k–$620k
Large home: 3,500+ sq ft, kitchen, 3+ baths and major reconfiguration$215k–$365k$365k–$625k$625k–$1.1M

What the three finish levels mean:

  • Essential: updated layout, mid-grade materials, standard cabinetry.
  • Signature: custom-built cabinetry, premium quartz and tile, name-brand fixtures.
  • Luxury: fully custom millwork, high-end stone, luxury appliances and designer finishes.

Common add-ons

Many whole-house projects include one or more of these. Each is a separate range added to the base project.

Add-onTypical range
Open up walls / new floor plan$15k–$42k
Room addition (any size)$60k–$180k
Sitewide flooring replacement$16k–$38k
Sitewide window replacement$18k–$48k
New HVAC system$10k–$24k
Smart-home wiring and fixtures$5k–$18k

What a JDI whole-house quote includes and leaves out

The calculator ranges reflect design-build pricing. JDI's whole-home calculator lists what its ranges include and what they leave out:

IncludedNot included
Design and drawings for your approved planAdd-ons you did not select, for example a new HVAC system or an addition
Permit applications and inspections, coordinated by JDISales tax (Washington projects) and city permit fees, itemized on your written quote
Demolition, haul-away and site protectionRepairs to hidden damage found inside walls or floors (rot, old leaks, outdated wiring), handled by written change order
Cabinetry, counters, tile and flooring at your finish level, plus HVAC rough-insFurniture, decor and window coverings
Plumbing by separate licensed plumbing contractors and electrical by licensed electrical contractors
Lighting, fixtures and finished installation

A range is a budgeting tool, not a bid. The firm number comes after JDI has seen the house. When you collect more than one estimate, our guide to comparing whole-house remodel estimates line by line shows how to check that each one prices the same project.

What moves a project up or down a tier

Finish selections

The tier descriptions start with cabinetry for a reason: standard cabinet lines, custom-built cabinets and fully custom millwork sit in different tiers, and stone, tile, fixtures and appliances follow the same pattern.

How much of the layout changes

Keeping kitchens and bathrooms where they are keeps plumbing runs short. Moving them, or opening a wall, adds framing, beams, engineering and rerouted plumbing, electrical and ductwork. That is why "open up walls / new floor plan" is its own add-on.

The age and condition of the house

About 40 percent of Vancouver's housing was built before 1980, according to Census Bureau estimates for 2020–2024. Older houses bring costs newer ones don't:

  • Lead paint in pre-1978 homes requires a certified firm and lead-safe containment.
  • Asbestos. Clark County's air agency rule, SWCAA 476 (effective March 22, 2026), requires suspect materials to be treated as asbestos or surveyed by an accredited inspector before renovation. Removal, if needed, is specialized work.
  • Wiring. Homes wired between 1965 and the mid-1970s may have aluminum branch circuits that need repair by a qualified electrician.
  • Insulation. When exterior walls are opened, Washington's energy code requires the exposed cavities to be filled with insulation: at least R-15 in 2x4 walls and R-21 in 2x6 walls. Replacement windows must meet a U-factor of 0.30 or lower.
  • Hidden damage such as old leaks under bathrooms, which only shows up once floors are open.

Systems you replace while the walls are open

A new electrical panel, new HVAC or sitewide windows add cost, but they are simpler to do while the walls and floors are already open than after the remodel is finished.

Sales tax on a whole-house remodel

In Washington, remodeling for a homeowner is a retail sale, and the contractor collects sales tax on the full contract price, labor included (WAC 458-20-170). The rates for the fourth quarter of 2026, unchanged since April 1, 2026:

  • City of Vancouver: 8.9%
  • Unincorporated Clark County: 8.0%, or 8.7% inside the public transportation benefit area

The Department of Revenue has announced that the City of Vancouver's rate rises to 9.0% on January 1, 2027, so a contract signed or billed after that date may carry the higher rate.

As an illustration, 8.9% on a Signature-level standard refresh in the $140,000–$240,000 range comes to $12,460–$21,360. Rates change quarterly, and the right one depends on the exact address, so check the Department of Revenue's rate pages and lookup tool. L&I recommends that your contract state the price including sales tax, so ask how any quote you compare shows it. Our sales tax on remodeling guide goes deeper, and for anything specific to your situation, ask your tax adviser.

Permits

Permits are inside the calculator ranges, but it helps to know how they are priced. In Vancouver city limits, building permit and plan review fees are based on the city's valuation of the work, which the building official sets from national averages, not on your contract price. When a permit covers more than one code, such as building, plumbing and mechanical together, the city charges 1.6 times the base building fee, plus plan review, a technology fee and an issuance fee. The current fees are on the city's building permit fee page, which also has a fee quote form; the city's fees rise each January 1.

Outside city limits, Clark County issues building permits and L&I issues electrical permits.

Property taxes after the remodel

Washington's home improvement exemption can exempt the added value of a remodel from property tax for three assessment years, up to 30 percent of the value of the original structure. It can be claimed once in five years, and repairs and maintenance don't qualify. The Clark County Assessor requires the application before construction is completed and asks for the building permit number, so file early. Our property tax and remodeling guide has the details.

Phasing: what it adds

A whole-house remodel can be split into phases, often the kitchen and primary bath first, then an addition or the secondary bathrooms. Phasing lets you move into finished rooms sooner and spread the cost, but it adds about 5–10% over a single continuous build. On a project in the $140,000–$240,000 range, that is roughly $7,000–$24,000.

Time on site matters for planning too. JDI's standard refreshes typically run 4–7 months on site after design and permits, and mid-sized and large homes with additions run 7–14 months.

Financing

JDI offers financing through Lend Home Improvements and Medallion Bank, subject to credit approval. Many homeowners also look at borrowing against their home. The Consumer Financial Protection Bureau describes the main options: a home equity line of credit lets you borrow against your equity as needed, a home equity loan pays a lump sum repaid in regular payments, and a cash-out refinance replaces your mortgage with a larger one. Compare the terms with your lender before you sign the remodeling contract.

How to get a firm quote

  1. Use the calculator to set a budget range.
  2. Schedule an in-home consultation. JDI looks at the house and talks through scope, materials and timeline. Our page on your first consultation lists what to bring.
  3. Review the preliminary design.
  4. Receive a written, line-item estimate, signed before any work begins.

Frequently asked questions

Is the calculator number a quote?

No. It is a budgeting range based on 2026 Portland and Vancouver pricing. JDI quotes firm in writing after an in-home visit and preliminary design.

Does sales tax apply to labor on a remodel?

Yes. In Washington the contractor collects retail sales tax on the full contract price, labor included. In Vancouver city limits the rate is 8.9% for the fourth quarter of 2026, rising to 9.0% on January 1, 2027.

How much does phasing add?

About 5–10% compared with doing the whole project in one continuous build.

Will a whole-house remodel raise my property taxes?

If the remodel adds value, your assessment can rise. Washington's three-year exemption can shelter part of that added value if you apply with the Assessor before the work is completed. Ask your tax adviser about your situation.

Rules, rates and fees change; confirm current figures with the City of Vancouver, Clark County and the Department of Revenue before you budget.

How JDI can help

JDI Construction has designed and built whole-house remodels across Clark County and the Portland metro since 2007, with a 5-year written workmanship warranty on every project. To turn a range into a firm number, request a consultation for your whole-house remodel. This post is part of our Whole-House, Addition and ADU Guide.

Keep going: Whole-house remodeling in Vancouver · Estimate your cost · Completed projects · How a JDI project runs · Client reviews

About the authorEric RyapolovHead Project Manager · Quality, Craftsmanship & Construction Leadership

Having been involved in more than 400 JDI remodeling projects, Eric brings extensive hands-on construction knowledge and project management experience to the team. Read Eric's bio →

Get started

Ready to talk through your remodel?

Tell us what is not working in your home and what you want it to become. We will help you understand the scope, timeline, budget, and next steps before you commit to the project.

What happens next
  1. 1Get in TouchA personal consultation and a detailed estimate.
  2. 2Kickoff the Design PhaseDesign development, finalization, and budget.
  3. 3Start Your ProjectA dedicated project manager and portal access for updates.
Prefer to talk?(360) 309-9571
Monday – Friday, 8:00am – 6:00pm · WA License JDICOCN932KZ · OR CCB 176101
Service area

Based in Vancouver. Serving Clark County & the Portland metro.

Headquartered at 1419 Broadway Street, Vancouver, with a Portland meeting office by appointment. No franchises; our in-house crews drive to every project from here.

Call (360) 309-9571Free estimate